Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Electric forced convection ovens, steam cookers and combination ovens for professional use - Test methods for measuring the performance (Fast track)
30.99 CD approved for registration as DIS
DC filter capacitors for HVDC transmission system
20.99 WD approved for registration as CD
Electronics assembly technology - Part 1-1: Sintering - Generic description
20.99 WD approved for registration as CD
Railway Applications - Requirements for software development
20.99 WD approved for registration as CD
Pressure calculation for electrical installations with rated voltages above AC 1 kV and their installation rooms in the event of an arc fault
20.99 WD approved for registration as CD
Low-voltage power capacitors - Automatic reactive power controllers for capacitor banks
20.99 WD approved for registration as CD
Primary Frequency Control Framework of System with High Penetration of Inverter-based Sources
30.20 CD study/ballot initiated
Grid-forming technology and applications in renewable energy dominated power systems
30.20 CD study/ballot initiated
Railway applications – Fixed installations – Lightning protection principles for overhead contact lines systems
20.99 WD approved for registration as CD
Railway applications - Safety protocols for signaling applications - Part 1: Generic aspects of safety related transmission protocols
20.99 WD approved for registration as CD
Railway applications - Safety protocols for signaling applications - Part 3: PVS: Safety related transmission protocol for application between ground systems
20.99 WD approved for registration as CD
Railway applications - Safety protocols for signaling applications - Part 4: Rail Safe Transport Application Protocol
20.99 WD approved for registration as CD
Marine Battery Containers - Part 1: Technical Requirements
20.99 WD approved for registration as CD
Marine Battery Containers - Part 2: Connection and Interface System
20.99 WD approved for registration as CD
Batch control - Part 0: Life cycle model for Batch Control
10.20 New project ballot initiated
Sampling and Conditioning LNG for Continuous Analysis
00.99 Approval to ballot proposal for new project
Key Performance Aspects for Smart Manufacturing
10.20 New project ballot initiated
INDUSTRIAL NETWORKS – 5G COMMUNICATION TECHNOLOGY – Part 4: Specification for the deployment of 5G in an IA plant
10.20 New project ballot initiated