DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Materials for circuit boards and other interconnecting structures - Part 3-X: Sectional specification set for unreinforced base materials, clad and unclad - Build-up film of defined dissipation factor (greater than 0,0030 and equal to or less than 0,0050 at 10 GHz) for rigid organic package substrate, unclad

10.60 Close of voting

TC 91 more

Sintering assembly technology - Part 1: Generic description

10.60 Close of voting

TC 91 more

Test method for electrical materials, circuit board and other interconnection structures and assemblies - Part 2-X: Test methods for interconnection structures - Test methods for relative permeability and magnetic loss tangent of magnetic dielectric materials for circuit boards at 1 MHz to 1 GHz using impedance analyzer

10.20 New project ballot initiated

TC 91 more

Thermography test method for printed circuit interconnection defects

10.20 New project ballot initiated

TC 91 more

Materials for circuit boards and other interconnecting structures - Part 3-X: Sectional specification set for unreinforced base materials, clad and unclad – Build-up film of defined dissipation factor (greater than 0,0050 and equal to or less than 0,0080 at 10 GHz) for rigid organic package substrate, unclad

10.20 New project ballot initiated

TC 91 more

Materials for circuit boards and other interconnecting structures - Part 3-X: Sectional specification set for unreinforced base materials, clad and unclad – Build-up film of defined dissipation factor (greater than 0,0080 and equal to or less than 0,0200 at 10 GHz) for rigid organic package substrate, unclad

10.20 New project ballot initiated

TC 91 more

Circuit Board 2D Barcode Marking Requirements

10.20 New project ballot initiated

TC 91 more

Thermal Endurance Test Method for Flexible Optic-Electric Circuit

00.99 Approval to ballot proposal for new project

TC 91 more

PRINTED BOARDS AND PRINTED BOARD ASSEMBLIES– DESIGN AND USE - Part 8: 3D shape data for CAD component library

00.99 Approval to ballot proposal for new project

TC 91 more

Noncontact Temperature measurement for LAB using IR camera

00.00 Proposal for new project received

TC 91 more

Electrical Relays – Electromagnetic Compatibility

10.20 New project ballot initiated

TC 94 more

Measuring relays and protection equipment - Part 1xx Functional requirements for fault location

00.99 Approval to ballot proposal for new project

TC 95 more

Requirements and roadmap for DC protection function standardisation

00.00 Proposal for new project received

TC 95 more

Insulation co-ordination for HVDC system — Part 1: Definitions, principles and rules

00.99 Approval to ballot proposal for new project

TC 99 more

Insulation co-ordination for HVDC system — Part 2: Application guidelines for line commutated converter (LCC) stations

00.99 Approval to ballot proposal for new project

TC 99 more

Electromagnetic compatibility of appliances, electric tools and similar apparatus - Part 3: Limits and methods of measurement of electromagnetic emissions for professional equipment in commercial and light-industrial locations

10.20 New project ballot initiated

CISPR/CIS/F more

Internet of Things (IoT) – IoT application on power distribution system: Architecture and functional requirements

00.99 Approval to ballot proposal for new project

ISO/IEC JTC 1/SC 41 more

(AWI) Internet of Things (IoT) – Environmental and ecological effects, risks, and considerations of underwater acoustic signalling

00.00 Proposal for new project received

ISO/IEC JTC 1/SC 41 more