Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Low-voltage switchgear and controlgear - Part 10: Semiconductor circuit-breakers
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 5-2: Control circuit devices and switching elements - Proximity switches
20.99 WD approved for registration as CD
Low-voltage switchgear and controlgear - Part 5-3: Control circuit devices and switching elements - Requirements for proximity devices with defined behaviour under fault conditions (PDDB)
50.00 Final text received or FDIS registered for formal approval
Low-voltage switchgear and controlgear - Part 5-5: Control circuit devices and switching elements - Electrical emergency stop device with mechanical latching function
60.00 Standard under publication
Low-voltage switchgear and controlgear - Part 6-1: Multiple function equipment - Transfer switching equipment
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Low-voltage switchgear and controlgear - Part 7-2: Ancillary equipment - Protective conductor terminal blocks for copper conductors
40.20 DIS ballot initiated: 12 weeks
Low-voltage switchgear and controlgear - Part 7-4: Ancillary equipment - PCB terminal blocks for copper conductors
40.20 DIS ballot initiated: 12 weeks
Calculation of thermally permissible short-circuit currents, taking into account non-adiabatic heating effects
20.99 WD approved for registration as CD
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 2: Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
40.20 DIS ballot initiated: 12 weeks
Nuclear facilities - Instrumentation systems important to safety - Radiation monitoring for accident and post-accident conditions - Part 4: Equipment for continuous in-line or on-line monitoring of radioactivity in process streams
40.20 DIS ballot initiated: 12 weeks
Rules for steam turbine thermal acceptance tests - Part 1: High accuracy for large condensing steam turbines
40.20 DIS ballot initiated: 12 weeks
Rules for steam turbine thermal acceptance tests - Part 4: Routine testing
40.60 Close of voting
Functional design criteria for a safety parameter display system for nuclear power stations
30.60 Close of voting/ comment period
Radio frequency and coaxial cable assemblies - Part 1-1: Guidance, additional specifications, and test methods for cable assemblies for reference measurements and test fixtures
30.20 CD study/ballot initiated
Amendment 1 - Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Amendment 1 - Arc welding equipment - Part 7: Torches
20.99 WD approved for registration as CD
Medical electrical equipment - Medical electron accelerators - Functional performance characteristics
30.60 Close of voting/ comment period