Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Distribution automation using distribution line carrier systems - Part 5-6: Medium-voltage High Speed Power Line Communication systems
30.20 CD study/ballot initiated
Electrostatics - Part 2-1: Measurement methods - Ability of materials and products to dissipate static electric charge
20.99 WD approved for registration as CD
Electrostatics - Part 2-4: Measurement methods - Electrostatic discharge characterisation of non-metals
30.20 CD study/ballot initiated
Electrostatics - Part 4-6: Standard test methods for specific applications - Wrist straps
20.99 WD approved for registration as CD
Electrostatics - Part 5-4: Protection of electronic devices from electrostatic phenomena - Compliance verification
50.00 Final text received or FDIS registered for formal approval
Circuit-breaker in modular form
40.99 Full report circulated: DIS approved for registration as FDIS
Contact and organisation information
50.60 Close of voting. Proof returned by secretariat
Maintenance of UoM data dictionary (IEC 62720)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Standard data element types with associated classification scheme - Part 1: Definitions - Principles and methods
20.99 WD approved for registration as CD
Standard data element types with associated classification scheme for electric components - Part 6: CDD modelling guideline for the use of concepts
20.99 WD approved for registration as CD
Electrical installations of ships and mobile and fixed offshore units - Part 1: Procedures for calculating short-circuit currents in three-phase a.c.
30.60 Close of voting/ comment period
Railway applications - Rolling stock equipment - Shock and vibration tests
60.00 Standard under publication
Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture
60.00 Standard under publication
Electronic railway equipment - Train communication network (TCN) - Part 2-3: TCN communication profile
40.20 DIS ballot initiated: 12 weeks
Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone
40.20 DIS ballot initiated: 12 weeks
Electronic railway equipment - Train communication network (TCN) - Part 2-6: Train-to-ground communication
50.60 Close of voting. Proof returned by secretariat
Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB)
20.99 WD approved for registration as CD