Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Child care articles — General safety — Part 1: Safety philosophy and assessment
30.60 Close of voting/ comment period
Child care articles — General safety — Part 3: Chemical hazards
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Child care articles — General safety — Part 5: Product information
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Genomics informatics — Procedures for gene expression panel-based similarity calculation for human pluripotent stem cell-derived organoids
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Genomics informatics — Multi-omics quality control and data integration
40.60 Close of voting
Health Informatics — Selection criteria and terminology linkage for graphical content
20.00 New project registered in TC/SC work programme
Ships and marine technology — Piping and machinery — Safety guidelines for engine rooms of ammonia fuelled vessels
40.99 Full report circulated: DIS approved for registration as FDIS
Cameras and image sensors used for machine vision applications — Method to measure, compute and present specification parameters and characterization data
30.20 CD study/ballot initiated
Standardized post-fire data collection methods from large outdoor fires
40.00 DIS registered
Fine ceramics (advanced ceramics, advanced technical ceramics) — Guidance on the conduction of high temperature gaseous corrosion of ceramics
00.00 Proposal for new project received
Blockchain and distributed ledger technologies — Requirements and guidance for establishing, improving, preserving, and assessing the privacy capability of DLT systems
40.20 DIS ballot initiated: 12 weeks
Oil and gas industries including lower carbon energy — Pipeline transportation systems — Pipeline Inspection Data Alignment Specification
30.60 Close of voting/ comment period
Oil and gas industries including lower carbon energy — Pipeline transportation systems — On-land pipeline repair
30.60 Close of voting/ comment period
Performance matrix for strain-based simplified design of reinforced concrete beam
30.00 Committee draft (CD) registered
Pigments and extenders - Iron blue pigments — Specifications and methods of test
20.00 New project registered in TC/SC work programme
Simplified seismic performance evaluation and design guideline for precast concrete building
00.00 Proposal for new project received
Simplified Design Standard on Concrete Arch Bridges
20.00 New project registered in TC/SC work programme
Biotechnology — Biobanking — General requirements for (semi-)automated storage and retrieval equipment
50.00 Final text received or FDIS registered for formal approval