Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Medical laboratories — Guidance for personnel competence and development
10.60 Close of voting
Service excellence — Designing excellent service to achieve outstanding customer experiences — Requirements and guidance
20.60 Close of comment period
Implants for Surgery — Partial and total shoulder joint prosthesis — Determination of resistance to torque-off head fixation of modular humeral prostheses
00.00 Proposal for new project received
Implants for Surgery — Partial and total shoulder joint replacement — Part 1: Determination of resistance to torque of head fixation of modular humeral components
10.60 Close of voting
Implants for Surgery - Partial and total shoulder joint prosthesis — Part 2: Determination of resistance to torque-off head fixation of modular humeral prostheses
00.00 Proposal for new project received
Meat, fish and their products — Determination of sulfite (sulphite) content — Acid-base titration method
40.20 DIS ballot initiated: 12 weeks
Meat and meat products — Determination of hydroxyproline content — High performance liquid chromatography (HPLC) method
40.00 DIS registered
Grid square statistics and their applications — Part 2: Methodological aspects of grid square statistics
00.60 Close of review
Fine ceramics (advanced ceramics, advanced technical ceramics) — Impedance measurement of conductive oxide ceramics at high temperatures using the two-electrode method for symmetric button cell
00.60 Close of review
Air conditioning — Graphical symbols for operations and displays
10.20 New project ballot initiated
Robotics — Electrical interfaces — Connectivity and interoperability for end-effectors
20.00 New project registered in TC/SC work programme
Space systems — Space debris mitigation requirements
30.99 CD approved for registration as DIS
Internal protection by polymeric lining for ductile iron pipes — Requirements and test methods — Part 4: Ceramic epoxy lining
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Ships and marine technology — Design and testing of marine transfer arms for liquefied hydrogen
30.99 CD approved for registration as DIS
Industrial trucks — Additional requirements for automated functions on trucks
30.60 Close of voting/ comment period
Milk and milk products — General requirements for the harmonization and simplification of the use and interpretation of certificate of analysis for standards of veterinary medicines
40.00 DIS registered
Safe design aspects for machinery in feed processing mills
50.00 Final text received or FDIS registered for formal approval