Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Energy performance of lifts, escalators and moving walks — Part 3: Energy calculation and classification of escalators and moving walks
00.00 Proposal for new project received
Biotechnology — Bioprocessing — General requirements and considerations for processing decellularized extracellular matrices of soft tissues
30.20 CD study/ballot initiated
Pulps — Black liquor — Dry matter content and fibre content
30.60 Close of voting/ comment period
Road vehicles — Symbols for controls, indicators and tell-tales — Amendment 2
20.00 New project registered in TC/SC work programme
Ships and maritime technology — Requirements for the secured ship network (SSN)
50.00 Final text received or FDIS registered for formal approval
Steel and iron - Determination of total aluminium and total boron contents - Inductively coupled plasma mass spectrometric method with microwave digestion
20.00 New project registered in TC/SC work programme
Laboratory design — Smart laboratory design — General requirements
30.92 CD referred back to Working Group
Laboratory design — Smart laboratory design — Requirements of smart laboratories for dairy products
30.92 CD referred back to Working Group
Plastics - Determination of fatigue properties
00.00 Proposal for new project received
Particulate reference materials - Uniform non-spherical particles
00.00 Proposal for new project received
Calibration of aerosol particle number concentration conditioners
00.00 Proposal for new project received
Railway applications — Coupler and buffer system — General vocabulary
20.00 New project registered in TC/SC work programme
Multi-channel active measurement of the surface wave to estimate shear wave velocity profile
20.60 Close of comment period
Aerospace — Drives, internal, TORX® driver bit — Geometrical definition, gaging and technical requirements
40.99 Full report circulated: DIS approved for registration as FDIS
Oil and gas industries including lower carbon energy — Evaluation of oil and gas field equipment and materials with carbon emission
30.20 CD study/ballot initiated
Road vehicles — Electrical requirements and tests for electrical and electronic systems and components with a supply voltage of 12 V, 24 V and 48 V — Part 1: General
20.20 Working draft (WD) study initiated