DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Household and similar electrical air cleaning appliances – Methods for measuring the performance – Part 2-6: Particular requirements for fresh-air air cleaners

20.99 WD approved for registration as CD

TC 59/SC 59N more

Household and similar electrical air cleaning appliances - Methods for measuring the performance - Part 2-5: Particular requirements for determination of the performance change by loading with particles

50.00 Final text received or FDIS registered for formal approval

TC 59/SC 59N more

Household and similar electrical air cleaning appliances — Method for measuring performance — Part 2-2: Particular requirements for determination of gas-phase pollutant reduction

40.99 Full report circulated: DIS approved for registration as FDIS

ISO/TC 142 more

Household and similar electrical air cleaning appliances — Methods for measuring the performance — Part 2-3: Particular requirements for reduction of microorganisms

30.60 Close of voting/ comment period

ISO/TC 142 more

Household and similar electrical air cleaning appliances — Methods for measuring the performance — Part 2-5: Particulate requirements for measurement of performance change with particle loading

30.99 CD approved for registration as DIS

ISO/TC 142 more

Assistive listening devices and systems for active assisted living

50.00 Final text received or FDIS registered for formal approval

TC 100 more

Photovoltaics in buildings - Part 3: Determination methodology for the solar heat gain coefficient of building-integrated photovoltaic modules

50.60 Close of voting. Proof returned by secretariat

TC 82 more

Photovoltaics in buildings — Part 3: Evaluation methodology of SHGC for Building integrated photovoltaic modules with various designs

50.60 Close of voting. Proof returned by secretariat

ISO/TC 160 more

Grid code compliance assessment methods for grid connection of renewable energy power plants

50.00 Final text received or FDIS registered for formal approval

TC 8/SC 8A more

Electrical installations in ships – Primary and secondary DC distribution, system design architecture

30.20 CD study/ballot initiated

TC 18 more

Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality

20.99 WD approved for registration as CD

TC 82 more

Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance

40.20 DIS ballot initiated: 12 weeks

TC 21/SC 21A more

Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety

40.20 DIS ballot initiated: 12 weeks

TC 21/SC 21A more

Lighting systems - General requirements

40.60 Close of voting

TC 34 more

Information exchange for electric vehicle charging roaming service Part 3: Message structure

30.60 Close of voting/ comment period

TC 69 more

Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 1: General principles

30.99 CD approved for registration as DIS

TC 65 more

Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 2: Diagram symbols and drawing principles

20.99 WD approved for registration as CD

TC 65 more

Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 3: Application Function Blocks

20.99 WD approved for registration as CD

TC 65 more