DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

IEC TS 62257-3:2015 ED2

Recommendations for renewable energy and hybrid systems for rural electrification - Part 3: Project development and management
11 dhj 2015

General information

60.60     11 dhj 2015

IEC

TC 82

Technical Specification

27.160  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC TS 62257-3:2015(E) provides information on the responsibilities involved in the implementation of rural power systems. More particularly it covers:
- contractual relationships to be built between the different participants to a project;
- the relevant tests to be applied to renewable energy and hybrid electrification systems;
- quality assurance principles to be implemented;
- requirements for recycling and protection of the environment. The main technical changes with regard to the previous edition are as follows:
- redefine the maximum AC voltage from 500 V to 1 000 V, the maximum DC voltage from 750 V to 1 500 V;
- removal of the limitation of 100 kVA system size.

This publication is to be read in conjunction with IEC 62257 series.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC TS 62257-3:2004 ED1

NOW

PUBLISHED
IEC TS 62257-3:2015 ED2
60.60 Standard published
11 dhj 2015

REVISED BY

ABANDON
IEC TS 62257-3 ED3