Revised
IEC 60079-13:2010 gives requirements for the design, construction, assessment and testing and marking of rooms protected by pressurization in:
- a room located in an explosive gas atmosphere or explosive dust atmosphere hazardous area that does not include an internal source of a flammable substance;
- a room located in an explosive gas atmosphere or explosive dust atmosphere hazardous area that includes an internal source of a flammable substance;
- a room located in a non-hazardous area that includes an internal source of a flammable substance.
This publication is to be read in conjunction with IEC 60079-0:2007.
WITHDRAWN
IEC TR 60079-13:1982 ED1
WITHDRAWN
IEC 60079-13:2010 ED1
99.60
Withdrawal effective
22 maj 2017
PUBLISHED
IEC 60079-13:2017 ED2