Publikuar
This part of this European Standard specifies the minimum requirements for safety related equipment for shell boilers as defined in EN 12953-1, to ensure the boiler operates within the allowable limits (pressure, temperature, etc.) and if the limits are exceeded the energy supply shall be interrupted and locked out without manual (human) intervention at the boiler.
NOTE 1 The maximum time of operation without manual (human) intervention should be defined for each boiler system.
NOTE 2 Annex C (informative) gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 72 hours.
Directives related to this standards.
Replaces
SSH EN 12953-6:2004
PUBLISHED
SSH EN 12953-6:2011
60.60
Standard published
30 maj 2012
Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.