DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 62382:2007

Kontrolli në qark të mbyllur për përdorimin e instrumentave elektrik

Electrical and instrumentation loop check
29 tet 2008
95.99 Withdrawal of Standard   21 tet 2016

General information

95.99     21 tet 2016

DPS

DPS/KT 6

European Norm

25.040.01  

anglisht  

Buying

Shfuqizuar

Language in which you want to receive the document.

Scope

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Life cycle

NOW

WITHDRAWN
SSH EN 62382:2007
95.99 Withdrawal of Standard
21 tet 2016

REVISED BY

PUBLISHED
SSH EN 62382:2013

Related project

Adopted from EN 62382:2007

Adopted from IEC 62382 Ed. 1.0 en