Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
General requirements for grid-forming control of renewable energy
00.00 Proposal for new project received
Primary Frequency Coordinated Control Framework of System with High Penetration of Inverter Based Generation
00.00 Proposal for new project received
Gaseous Hydrogen - Fuel system components for hydrogen fuelled vehicles - Part 2: Rail vehicles
10.20 New project ballot initiated
Materials for printed boards and other interconnecting structures - Part 2-XX: Reinforced base materials clad and unclad – Non-halogenated epoxide modified bismaleimide/triazine with filler woven glass laminate sheets of low thermal expansion and flammability (vertical burning test), copper-clad for IC substrate
10.20 New project ballot initiated
Materials for circuit boards and other interconnecting structures - Part 3-X: Sectional specification set for unreinforced base materials, clad and unclad - Build-up film of defined dissipation factor (greater than 0,0030 and equal to or less than 0,0050 at 10 GHz) for rigid organic package substrate, unclad
10.20 New project ballot initiated
Sintering assembly technology - Part 1: Generic description
10.20 New project ballot initiated
Thermal Endurance Test Method for Flexible Optic-Electric Circuit
00.99 Approval to ballot proposal for new project
PRINTED BOARDS AND PRINTED BOARD ASSEMBLIES– DESIGN AND USE - Part 8: 3D shape data for CAD component library
00.99 Approval to ballot proposal for new project
Measuring relays and protection equipment - Part 1xx Functional requirements for fault location
00.99 Approval to ballot proposal for new project
Requirements and roadmap for DC protection function standardisation
00.00 Proposal for new project received
Insulation co-ordination for HVDC system — Part 1: Definitions, principles and rules
00.99 Approval to ballot proposal for new project
Insulation co-ordination for HVDC system — Part 2: Application guidelines for line commutated converter (LCC) stations
00.99 Approval to ballot proposal for new project
Information technology-Home Electronic System (HES) architecture – Part 5-106: Intelligent grouping and resource sharing for HES Class 2 and Class 3 – Home networked fitness exercise equipment system architecture
10.20 New project ballot initiated
Internet of Things (IoT) – IoT application on power distribution system: Architecture and functional requirements
00.99 Approval to ballot proposal for new project
(AWI) Internet of Things (IoT) – Environmental and ecological effects, risks, and considerations of underwater acoustic signalling
00.00 Proposal for new project received