DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Flow batteries for stationary applications – Part 4-2: Electrolyte for vanadium flow batteries – Test methods

20.99 WD approved for registration as CD

TC 21 më tepër

Flow batteries for stationary applications - Part 5: Vanadium flow battery stack

20.99 WD approved for registration as CD

TC 21 më tepër

Electric energy storage (ESS) systems – Part 2-4 Guidelines for the Integration of Diverse Accumulation Subsystems in EESS

30.20 CD study/ballot initiated

TC 120 më tepër

Electrical energy storage (EES) systems - Part 3-2: Planning and performance assessment of electrical energy storage systems - Specific requirements for power intensive and renewable energy sources integration related applications

20.99 WD approved for registration as CD

TC 120 më tepër

Electrical energy storage (EES) systems - Part 3-3: Planning and performance assessment of electrical energy storage systems - Specific requirements for energy intensive and backup power applications

20.99 WD approved for registration as CD

TC 120 më tepër

Terrestrial photovoltaic (PV) modules - Quality system for PV module manufacturing

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 më tepër

Amendment 1 - Electrically operated spray seat for household and similar use - Methods for measuring the performance - General test methods of spray seats

40.00 DIS registered

TC 59/SC 59L më tepër

Residual direct current detecting device (RDC-DD) to be used for mode 3 charging of electric vehicles

50.00 Final text received or FDIS registered for formal approval

TC 23/SC 23E më tepër

Optical fibre cables - Shrinkage effects on cable and cable element end termination - Guidance

50.00 Final text received or FDIS registered for formal approval

TC 86/SC 86A më tepër

General lighting - Organic light emitting diode (OLED) products and related equipment - Terms and definitions

50.00 Final text received or FDIS registered for formal approval

TC 34 më tepër

Electronic displays – Part 1-2: Generic - Terminology and letter symbols related to optical measurement and evaluation

40.00 DIS registered

TC 110 më tepër

Electronic displays – Part 2-9: Measurements of optical characteristics – Temporal properties related to spot luminance

20.99 WD approved for registration as CD

TC 110 më tepër

Electronic displays - Part 3-9: Evaluation of optical performance - Display sparkle contrast

30.20 CD study/ballot initiated

TC 110 më tepër

HVDC Installations - Guidelines on Asset Management

40.99 Full report circulated: DIS approved for registration as FDIS

TC 115 më tepër

Photovoltaic modules - Bypass diode - Thermal runaway test

20.99 WD approved for registration as CD

TC 82 më tepër

High-temperature secondary batteries - Part 3: Sodium-based batteries - Performance requirements and tests

30.99 CD approved for registration as DIS

TC 21 më tepër

Workplace atmospheres - Part 1: Gas detection equipment - Performance requirements of detectors for toxic gases

40.00 DIS registered

TC 31 më tepër

Workplace Atmospheres — Part 1: Gas detectors — Performance requirements of detectors for toxic gases

10.99 New project approved

ISO/TC 146/SC 2 më tepër