DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Communication networks and systems for power utility automation - Part 7-401: Basic communication structure - Compatible logical node classes and data object classes - Protection part

30.99 CD approved for registration as DIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 7-43: Basic communication structure - Compatible logical node classes and data object classes - Common part

30.99 CD approved for registration as DIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 7-44: Basic communication structure - Compatible logical node classes and data object classes - Primary equipment part

30.99 CD approved for registration as DIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 7-440: Basic communication structure - Compatible logical node classes and data object classes - P/Q Metering part

30.99 CD approved for registration as DIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 80-5: Guideline for mapping information between IEC 61850 and IEC 61158-15

50.00 Final text received or FDIS registered for formal approval

TC 57 më tepër

Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 80-6: Using IEC 61850 for communication between substations and control centres

50.00 Final text received or FDIS registered for formal approval

TC 57 më tepër

Communication networks and systems for power utility automation - Part 80-7: Communication services and data model to support IEC 61850 system management

30.20 CD study/ballot initiated

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-19: Power system IED communication and associated data models for interoperability - Role Based Access Control (RBAC) with IEC 61850

50.00 Final text received or FDIS registered for formal approval

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-25: Model updates based on user feedback

30.60 Close of voting/ comment period

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-28: Specification to validate received GOOSE and SV messages

50.00 Final text received or FDIS registered for formal approval

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-29: Physical interfaces of an Intelligent Electronic Device (IED) and its connectivity

20.99 WD approved for registration as CD

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-32: Use of virtualized environment in IEC 61850 power utility automation system

40.99 Full report circulated: DIS approved for registration as FDIS

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-34: Using IEC 61850 for power transformer regulation

20.99 WD approved for registration as CD

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-23: Use of IEC 61850 for microgrid systems

20.99 WD approved for registration as CD

TC 57 më tepër

Communication networks and systems for power utility automation - Part 90-31: Use Cases for Dynamic Data model

20.99 WD approved for registration as CD

TC 57 më tepër

Conductive power and energy transfer systems for electric vehicles - Part 1: General system and specific Mode 3 EV charging station requirements

40.20 DIS ballot initiated: 12 weeks

TC 69 më tepër