Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Renewable energy off-grid systems - Part 421: Performance, safety, and durability assessment for small-scale off-grid solar water pumps
20.99 WD approved for registration as CD
Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
30.99 CD approved for registration as DIS
Renewable energy off-grid systems - Part 10: Silicon solar module visual inspection guide
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 120: Procurement processes, including tendering and evaluation
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 200: System selection and design
50.60 Close of voting. Proof returned by secretariat
Photovoltaic (PV) stand alone systems - Design verification
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 320: Generator set - Off-grid wind turbines
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 330: Generator set - Selection of generator sets for rural electrification systems
20.99 WD approved for registration as CD
Renewable energy off-grid systems - Part 341: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries
50.00 Final text received or FDIS registered for formal approval
Renewable energy off-grid systems - Part 345: Battery charge controllers for photovoltaic systems - Performance and functioning
30.99 CD approved for registration as DIS
Renewable energy off-grid systems - Part 350: Recommendations for selection of inverters
60.00 Standard under publication
Renewable energy off-grid systems - Part 410: Laboratory evaluation of lamps and lighting appliances for off-grid electricity systems
40.99 Full report circulated: DIS approved for registration as FDIS
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Nickel-cadmium prismatic rechargeable cells with partial gas recombination and batteries for use in industrial applications.
40.60 Close of voting
Enterprise-Control System Integration - Part 2: Object models and relationships for interfaces between manufacturing operations and business functions
50.60 Close of voting. Proof returned by secretariat
Enterprise-control system integration — Part 2: Objects and attributes for enterprise-control system integration
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration
40.60 Close of voting
Enterprise-control system integration — Part 4: Objects and attributes for manufacturing operations management integration
30.99 CD approved for registration as DIS
Enterprise-control system integration — Part 5: Business to manufacturing transactions
30.00 Committee draft (CD) registered