Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Communication networks and systems for power utility automation - Part 90-19: Power system IED communication and associated data models for interoperability - Role Based Access Control (RBAC) with IEC 61850
50.00 Final text received or FDIS registered for formal approval
Communication networks and systems for power utility automation - Part 90-25: Model updates based on user feedback
30.60 Close of voting/ comment period
Communication networks and systems for power utility automation - Part 90-28: Specification to validate received GOOSE and SV messages
50.00 Final text received or FDIS registered for formal approval
Communication networks and systems for power utility automation - Part 90-29: Physical interfaces of an Intelligent Electronic Device (IED) and its connectivity
20.99 WD approved for registration as CD
Communication networks and systems for power utility automation - Part 90-32: Use of virtualized environment in IEC 61850 power utility automation system
40.99 Full report circulated: DIS approved for registration as FDIS
Communication networks and systems for power utility automation - Part 90-34: Using IEC 61850 for power transformer regulation
20.99 WD approved for registration as CD
Communication networks and systems for power utility automation - Part 90-23: Use of IEC 61850 for microgrid systems
20.99 WD approved for registration as CD
Communication networks and systems for power utility automation - Part 90-31: Use Cases for Dynamic Data model
20.99 WD approved for registration as CD
Conductive power and energy transfer systems for electric vehicles - Part 1: General system and specific Mode 3 EV charging station requirements
40.20 DIS ballot initiated: 12 weeks
Conductive power and energy transfer systems for electric vehicles - Part 21-1 Electric vehicle on-board charger EMC requirements for conductive connection to AC/DC supply
40.20 DIS ballot initiated: 12 weeks
Conductive power and energy transfer systems for electric vehicles - Part 21-2: Electric vehicle requirements for conductive connection to an AC/DC supply - EMC requirements for off board electric vehicle charging systems
30.99 CD approved for registration as DIS
Conductive power and energy transfer systems for electric vehicles - Part 23: DC electric vehicle supply equipment
30.60 Close of voting/ comment period
<p>Conductive power and energy transfer systems for electric vehicles - Part 23-1: DC Charging with an automatic connection system</p>
40.99 Full report circulated: DIS approved for registration as FDIS
Conductive power and energy transfer systems for electric vehicles - Part 23-3: DC electric vehicle supply equipment for Megawatt charging systems
40.60 Close of voting
Conductive power and energy transfer systems for electric vehicles - Part 23-4: Portable DC EV supply equipment
30.20 CD study/ballot initiated
Conductive power and energy transfer systems for electric vehicles - Part 24: Digital communication between a DC EV supply equipment and an electric vehicle for control of DC charging
30.60 Close of voting/ comment period
<p>Electric vehicle conductive charging system - Part 26: EV supply equipment with automatic docking of a vehicle coupler located at the underbody of an electric vehicle</p>
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
<p>Electric vehicle conductive charging system - Part 27: EV supply equipment with automated docking of a vehicle coupler according to IEC 62196-2, IEC 62196-3 or IEC TS 62196-3-1</p>
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks