Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Fire protection — Automatic sprinkler systems — Part 12: Requirements and test methods for grooved-end components for steel pipe systems
00.00 Proposal for new project received
Fire protection — Automatic nozzle systems — Part 14: Requirements and test methods for water spray nozzles
20.00 New project registered in TC/SC work programme
Fire protection — Automatic sprinkler systems — Part 20: Requirements and test methods for non-metallic pipe and fittings
00.60 Close of review
Fire protection — Automatic sprinkler system — Part 9: Requirements and test methods for water mist nozzles
20.00 New project registered in TC/SC work programme
Rotary-shaft lip-type seals incorporating elastomeric sealing elements — Part 6: Specification of elastomeric materials
20.60 Close of comment period
Health informatics — Personalized digital health — Common factors for frailty assessment
50.92 FDIS or proof referred back to TC or SC
Implant for surgery — Test method for torsional strength of porous calcium salt bone void filler after preconditioning in deaerated phosphate buffered saline
00.60 Close of review
Petroleum products — Determination of thermal oxidation stability of gas turbine fuels
20.00 New project registered in TC/SC work programme
Requirements and recommendations for training programmes in community interpreting
30.00 Committee draft (CD) registered
Health informatics — Cybersecurity framework for telehealth environments — Part 3: Cybersecurity controls of telehealth
50.00 Final text received or FDIS registered for formal approval
Electric Motor-operated hand-held tools, transportable tools and lawn and garden machinery — Safety — Part 4-15: — Part 4-15: Particular requirements for battery powered ride-on lawnmowers
10.20 New project ballot initiated
Petroleum products — Aviation and distillate fuels — Determination of electrical conductivity
20.00 New project registered in TC/SC work programme
Structural steels — Part 7: Technical delivery conditions for Fire-resistant structural steels
20.00 New project registered in TC/SC work programme
Interpretation of fire effluents analysis using FTIR spectroscopy
10.20 New project ballot initiated
Road vehicles — Brake linings — Compressive strain test methods
20.00 New project registered in TC/SC work programme
Storage of cereals and pulses — Part 1: General recommendations for the keeping of cereals
30.60 Close of voting/ comment period
Calculation of load capacity of spur and helical gears — Part 20: Calculation of scuffing load capacity — Flash temperature method
20.00 New project registered in TC/SC work programme
Calculation of load capacity of spur and helical gears — Part 21: Calculation of scuffing load capacity — Integral temperature method
20.00 New project registered in TC/SC work programme