Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Sustainable and traceable biogas — Part 1: Requirements for biomethane certification registry schemes
20.00 New project registered in TC/SC work programme
Fluid power systems and components — Cylinders — Identification code for mounting dimensions and mounting types
00.00 Proposal for new project received
Rubber or plastics covered rollers — Specifications — Part 1: Requirements for hardness
30.60 Close of voting/ comment period
Rubber or plastics covered rollers — Specifications — Part 2: Surface characteristics
30.60 Close of voting/ comment period
Earth moving machinery — Safety of the intended functionality
30.20 CD study/ballot initiated
Aluminium ores — Experimental determination of the heterogeneity of distribution of a lot
20.00 New project registered in TC/SC work programme
Aluminium ores — Preparation of samples
20.00 New project registered in TC/SC work programme
Gas analysis — Comparison methods for determining and checking the composition of calibration gas mixtures — Amendment 1: Software B_LEAST – Performance check for non-linear model functions using alternative computer programs
30.99 CD approved for registration as DIS
Gas analysis — Preparation of calibration gas mixtures using dynamic volumetric methods — Part 4: Continuous syringe injection method
20.00 New project registered in TC/SC work programme
Gas analysis — Preparation of calibration gas mixtures using dynamic methods — Part 7: Thermal mass-flow controllers — Amendment 1: Correction of Formula C.4
40.99 Full report circulated: DIS approved for registration as FDIS
Fasteners — Surface discontinuities — Part 1: Bolts, screws and studs for general requirements
00.00 Proposal for new project received
Fasteners — Surface discontinuities — Part 3: Bolts, screws and studs for special requirements
00.00 Proposal for new project received
Hydraulic fluid power — Flange connections with split or one-piece flange clamps and metric or inch screws — Part 1: Flange connectors, ports and mounting surfaces for use at pressures of 3,5 MPa (35 bar) to 35 MPa (350 bar), DN 13 to DN 127
40.60 Close of voting
Fire protection — Automatic sprinkler systems — Part 11: Requirements and test methods for pipe hangers
40.20 DIS ballot initiated: 12 weeks
Fire protection — Automatic sprinkler systems — Part 12: Requirements and test methods for grooved-end components for steel pipe systems
00.00 Proposal for new project received
Fire protection — Automatic nozzle systems — Part 14: Requirements and test methods for water spray nozzles
20.00 New project registered in TC/SC work programme
Fire protection — Automatic sprinkler systems — Part 20: Requirements and test methods for non-metallic pipe and fittings
00.60 Close of review