Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Traditional Chinese medicine — Fritillaria cirrhosa, Fritillaria unibracteata, Fritillaria przewalskii, Fritillaria delavayi, Fritillaria taipaiensis, and Fritillaria unibracteata var. wabuensis Bulb
40.00 DIS registered
Supply chain interoperability and integration — Part 1: Overview and principles of the industrial internet
40.60 Close of voting
Supply chain interoperability and integration — Part 100: Verification of supply chain data
40.60 Close of voting
Supply chain interoperability and integration — Part 110: Verification of certificates in the supply chain
40.60 Close of voting
Supply chain interoperability and integration — Part 120: Verification of data in support of local purchasing
40.60 Close of voting
Supply chain interoperability and integration — Part 2: Vocabulary
40.60 Close of voting
Supply chain interoperability and integration — Part 240: Strategic sourcing concepts, principles, and data requirements
40.60 Close of voting
Supply chain interoperability and integration — Part 3: Verification of trading entity identity
40.60 Close of voting
Oil and gas industries including lower carbon energy — Positive Material Identification (PMI)
00.00 Proposal for new project received
Mobile non-sewer toilets cabins — Requirements of services and products relating to the deployment of cabins and sanitary products
40.20 DIS ballot initiated: 12 weeks
Test method for evaluating electrostatic properties of cleanable bag filter media.
00.00 Proposal for new project received
Environmental product declarations – Product Category Rules for air filters.
00.00 Proposal for new project received
Gas refill bottles for refillable lighters and refillable utility lighters — Safety specifications
20.00 New project registered in TC/SC work programme
Textile floor coverings and textile floor coverings in tile form — Determination of dimensional changes due to the effects of varied water and heat conditions and distortion out of plane
20.00 New project registered in TC/SC work programme
Lighters equipped with a flame-lock system — Safety specifications
20.00 New project registered in TC/SC work programme
Concrete terminology — Part 1: Principles of term categorization
20.00 New project registered in TC/SC work programme
Ships and marine technology --Specifications for the assessment of wind Propulsion System force matrix by analysis of speed and power trial data
00.60 Close of review
Determination of Composition of Selective Catalytic Reduction (SCR) Catalysts by X-ray Fluorescence Spectrometry (XRF)
30.99 CD approved for registration as DIS