Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Non-destructive testing — NDT personnel training organizations
20.60 Close of comment period
Friction stir welding — Steel — Part 1: Qualification of welding operators
40.60 Close of voting
Friction stir welding — Steel — Part 2: Specification and qualification of welding procedures
40.60 Close of voting
Friction stir welding — Steel — Part 3: Quality and inspection requirements
40.60 Close of voting
Tractors and machinery for agriculture and forestry — Safety-related parts of control systems — Part 1: General principles for design and development
20.60 Close of comment period
Tractors and machinery for agriculture and forestry — Safety-related parts of control systems — Part 2: Concept phase
20.60 Close of comment period
Tractors and machinery for agriculture and forestry — Safety-related parts of control systems — Part 3: Series development, hardware and software
20.60 Close of comment period
Tractors and machinery for agriculture and forestry — Safety-related parts of control systems — Part 4: Production, operation, modification and supporting processes
20.60 Close of comment period
Non-destructive testing of welds — Eddy current testing — Part 1: General
30.99 CD approved for registration as DIS
Welding and allied processes - Eddy current array testing — Part 2: Acceptance criteria
30.99 CD approved for registration as DIS
Light olefins for industrial use — Determination of trace sulfur — Ultraviolet fluorescence method
40.20 DIS ballot initiated: 12 weeks
Ethylene and propylene for industrial use — Determination of traces of carbon monoxide and carbon dioxide --Gas chromatographic method
40.20 DIS ballot initiated: 12 weeks
Ships and marine technology — Offshore gangway system
30.99 CD approved for registration as DIS
Blockchain and distributed ledger technologies – Information security controls based on ISO/IEC 27002 for distributed ledger services
30.60 Close of voting/ comment period
Revision of Reference Architecture and Vocabulary
00.00 Proposal for new project received
Small craft — Craft main propulsion system energy consumption assessment of moving small craft
50.00 Final text received or FDIS registered for formal approval
Battery swapping system - General aspects and safety requirements
00.00 Proposal for new project received