Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Space systems — Configuration management
50.00 Final text received or FDIS registered for formal approval
Categorization and classification of civil uncrewed aircraft systems
50.00 Final text received or FDIS registered for formal approval
Thermal insulation — Test method for thermal diffusivity — Periodic heat method
00.00 Proposal for new project received
Health and safety in welding and allied processes — Equipment for capture and separation of welding fume — Part 1: General requirements
10.99 New project approved
Health and safety in welding and allied processes — Equipment for capture and separation of welding fume — Part 2: Requirements for testing and marking of separation efficiency
10.99 New project approved
Health and safety in welding and allied processes — Equipment for capture and separation of welding fume — Part 4: Determination of the minimum air volume flow rate of capture devices
10.99 New project approved
Fine bubble technology — Characterization of microbubbles — Part 1: Off-line evaluation of size/size index
40.20 DIS ballot initiated: 12 weeks
Test methods for fibre-reinforced cementitious composites — Bending moment — Curvature curve by four-point bending test
20.00 New project registered in TC/SC work programme
Textiles — Qualitative and quantitative analysis of some cellulose fibres (lyocell, cupro) and their blends — Part 2: Blend quantification using light microscopy method
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Surface texture: Profile — Part 1: Indication of surface texture
20.00 New project registered in TC/SC work programme
Geometrical product specifications (GPS) — Surface texture: Profile — Part 2: Terms, definitions and surface texture parameters
20.00 New project registered in TC/SC work programme
Geometrical product specifications (GPS) — Surface texture: Profile — Part 3: Specification operators
20.00 New project registered in TC/SC work programme
Semantic data model for audit data services
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Mechanical vibration — Rotor balancing — Part 14: Procedures for assessing balance errors
40.60 Close of voting
Mechanical vibration — Rotor balancing — Part 24: Assessment of the unbalance measuring process
10.99 New project approved
Mechanical vibration — Rotor balancing — Part 31: Susceptibility and sensitivity of machines to unbalance
20.00 New project registered in TC/SC work programme
Mechanical vibration — Rotor balancing — Part 40: Blade moment balancing
00.00 Proposal for new project received
Machine Learning Application to Surface Analysis Data. Part I: Mass Spectrum and Imaging
00.60 Close of review