Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
District heating and cooling supply network – Surveillance systems — Part 2: Optical fiber monitoring system
00.00 Proposal for new project received
District heating and district cooling networks----technical requirements for substations components
00.60 Close of review
Evaluation method of coalbed methane recoverability
50.00 Final text received or FDIS registered for formal approval
Small craft — Electrical/electronic control systems for steering, shift and throttle
20.00 New project registered in TC/SC work programme
Traditional Chinese medicine — Sample preparation methods for smoke density test of smokeless moxibustion device
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Healthcare organization management - Guidelines for processing of multiple-use healthcare textiles
20.00 New project registered in TC/SC work programme
Road vehicles — Data parameter specification for body application units in commercial vehicles
40.60 Close of voting
Leather — Chemical analysis — Determination of glutaraldehyde content
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Timber structures — Mechanically laminated timber — Design
40.20 DIS ballot initiated: 12 weeks
Timber structures — Mechanically laminated timber — Production and qualification requirements
40.20 DIS ballot initiated: 12 weeks
Textiles — Thermal shrinkage of man-made filament yarns — Part 1: Determination in boiling water
50.00 Final text received or FDIS registered for formal approval
Textiles — Thermal shrinkage of man-made filament yarns — Part 2: Determination in dry-hot air (measurement after shrinkage)
50.00 Final text received or FDIS registered for formal approval
Textiles — Thermal shrinkage of man-made filament yarns — Part 3: Determination in dry-hot air (measurement during shrinkage)
40.60 Close of voting
Oil and gas industries including lower carbon energy — Enhanced oil recovery terms and definitions — Part 1: General vocabulary
60.00 Standard under publication
General requirements for integrated optoelectronic connectors for aerospace applications
50.00 Final text received or FDIS registered for formal approval
Oil and gas industries including lower carbon energy — Pipeline transportation systems — Strength match of girth welds in high grade steel oil and gas transmission pipelines
30.60 Close of voting/ comment period
Oil and gas industries including lower carbon energy — Pipeline transportation systems — Assessment techniques for determining fitness for service of pipeline steel for transportation of natural gas-hydrogen mixture
30.99 CD approved for registration as DIS