Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Geometrical product specifications (GPS) — Surface texture: Areal — Part 6: Classification of methods for measuring surface topography
40.60 Close of voting
Geometrical product specifications (GPS) — Surface texture: Areal — Part 607: Design and characteristics of non-contact (confocal microscopy) instruments
30.60 Close of voting/ comment period
Geometrical product specification (GPS) — Surface texture: Areal — Part 608: Design and characteristics of non-contact (digital holographic microscopy) instruments
10.20 New project ballot initiated
Geometrical product specification (GPS) — Surface texture: Areal — Part 70: Material measures
40.20 DIS ballot initiated: 12 weeks
Geometrical product specifications (GPS) — Surface texture: Areal — Part 701: Calibration and measurement standards for contact (stylus) instruments
20.00 New project registered in TC/SC work programme
Geometrical product specifications (GPS) — Surface texture: Areal — Part 71: Surface data file (SDF) file format
60.00 Standard under publication
Geometrical product specification (GPS) — Surface texture: Areal — Part 74: Software measurement standards
10.20 New project ballot initiated
Ship and Marine Technology — Full scaled test for rotor sail
20.20 Working draft (WD) study initiated
Ecological networks — Mapping of standardization needs
30.99 CD approved for registration as DIS
Test method for pulp yield of paper packaging products
20.00 New project registered in TC/SC work programme
Traditional Chinese medicine — Requirement for (high-performance) thin-layer chromatography [(HP)TLC] identification methods for medicinal herbs and natural products
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Sea trial methods for net energy-savings efficiency of air lubrication device
40.20 DIS ballot initiated: 12 weeks
Radiological protection - Monitoring and internal dose assessment for radiation workers handling plutonium
30.60 Close of voting/ comment period
Rare Earth - Guidance for data collection and validation for the calculation of carbon footprint
30.60 Close of voting/ comment period
Prefabricated building — Modular building — Concepts and general principles
30.60 Close of voting/ comment period
District heating and cooling supply network – Surveillance systems — Part 1: Electrical wire-based surveillance systems
00.00 Proposal for new project received