Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Earth-moving machinery — Collision warning and avoidance — Part 4: Risk area and risk level for swing/ rotation motion
50.00 Final text received or FDIS registered for formal approval
Earth-moving machinery — Collision warning and avoidance — Part 5: Risk area and risk level for other forms of motion
40.60 Close of voting
Iron ores — Determination of total iron content using the EDTA photometric titration method — Part 2: Fusion decomposition method
40.20 DIS ballot initiated: 12 weeks
Workplace air — Metals and metalloids in airborne particles — Part 1: Requirements for evaluation of measuring procedures
00.00 Proposal for new project received
Workplace air — Metals and metalloids in airborne particles — Part 2: Sampling
00.00 Proposal for new project received
Workplace air — Metals and metalloids in airborne particles — Part 3: Sample preparation
00.00 Proposal for new project received
Workplace air — Metals and metalloids in airborne particles — Part 4: Analysis by inductively coupled plasma emission spectrometry
00.00 Proposal for new project received
Dentistry — Materials for dental instruments — Part 1: Stainless steel — Amendment 1
10.99 New project approved
Dentistry — Materials for dental instruments — Part 3: Titanium and titanium alloys
00.00 Proposal for new project received
Fluid flow in closed conduits — Connections for pressure signal transmissions between primary and secondary elements
20.00 New project registered in TC/SC work programme
Rubber compounding ingredients — Carbon black — Determination of high-temperature loss on heating by thermogravimetry
40.60 Close of voting
Sterile packaged ready for filling glass cartridges
30.60 Close of voting/ comment period
Space systems — Configuration management
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Categorization and classification of civil uncrewed aircraft systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Thermal insulation — Test method for thermal diffusivity — Periodic heat method
00.00 Proposal for new project received
Health and safety in welding and allied processes — Equipment for capture and separation of welding fume — Part 1: General requirements
10.99 New project approved
Health and safety in welding and allied processes — Equipment for capture and separation of welding fume — Part 2: Requirements for testing and marking of separation efficiency
10.99 New project approved