Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Microbiology of the food chain — Requirements and guidelines for conducting challenge tests of food and feed products — Part 1: Challenge tests to study growth potential, lag time and maximum growth rate
00.00 Proposal for new project received
Road vehicles — Multidimensional measurement and coordinate systems definition for ATD
20.00 New project registered in TC/SC work programme
Cryogenic vessels — Static vacuum-insulated vessels — Part 1: Design, fabrication, inspection and tests
50.00 Final text received or FDIS registered for formal approval
Cryogenic vessels — Pressure-relief accessories for cryogenic service — Part 3: Sizing and capacity determination
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Hydraulic fluid power — Monitoring the level of particulate contamination in the fluid — Part 2: General Verification of Fluid Monitoring Systems
00.00 Proposal for new project received
Hydraulic fluid power — Monitoring the level of particulate contamination in the fluid — Part 4: Use of the light extinction technique
00.00 Proposal for new project received
Hydraulic fluid power — Part 5: Digital Imaging Analysis of contaminants
00.00 Proposal for new project received
Test method for fibre-reinforced cementitious composites — Load-deflection curve using circular plates
10.99 New project approved
Heat supply network — Vocabulary — Part 1: System
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Water quality — Determination of total organic carbon in water samples containing suspended solids by combined ultrasonic and alkaline extraction pretreatment
40.20 DIS ballot initiated: 12 weeks
Cryogenic vessels — Toughness requirements for materials at cryogenic temperature — Part 1: Temperatures below ‒80 °C
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Cryogenic vessels — Transportable vacuum insulated vessels of not more than 1 000 litres volume — Part 1: Design, fabrication, inspection and tests
40.60 Close of voting
Cryogenic vessels — Transportable vacuum insulated vessels of not more than 1 000 litres volume — Part 2: Operational requirements
00.00 Proposal for new project received
Animal and vegetable fats and oils — Determination of trace elements by inductively coupled plasma optical emission spectroscopy (ICP-OES)
40.60 Close of voting