Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Simultaneous interpreting — Interpreters’ working environment — Part 4: Requirements and recommendations for signed language interpreting
50.00 Final text received or FDIS registered for formal approval
Textile floor coverings — Determination of thickness of pile above the substrate
20.00 New project registered in TC/SC work programme
Welding and allied processes — Welding of reinforcing steel — Part 1: Load-bearing welded joints
40.99 Full report circulated: DIS approved for registration as FDIS
Welding and allied processes — Welding of reinforcing steel — Part 2: Non-load-bearing welded joints
40.99 Full report circulated: DIS approved for registration as FDIS
Sterilization of health care products — Moist heat — Requirements for the development, validation and routine control of a sterilization process for medical devices — Amendment 1
20.00 New project registered in TC/SC work programme
Road Vehicles - Principles for human remote support of automated driving systems
30.99 CD approved for registration as DIS
Wholemeal and flour from wheat (Triticum aestivum L.) — Determination of rheological behaviour as a function of mixing and temperature increase
00.00 Proposal for new project received
Intelligent transport systems — Operational design domain boundary and attribute awareness for an automated driving system
50.00 Final text received or FDIS registered for formal approval
Cork — Cork stoppers for still wine — Sampling plan for the quality control of cork stoppers
20.00 New project registered in TC/SC work programme
Microbiology of the food chain — Sampling techniques for microbiological analysis of food and feed samples
00.00 Proposal for new project received
Intelligent transport systems — Roadside infrastructure supported location-based services for connected automated mobility — Part 2: Data structure and message set definition
30.60 Close of voting/ comment period
Intelligent transport systems — Roadside infrastructure supported locationbased services for connected automated mobility via nomadic and mobile devices — Part 3: No turn on red (NTOR) at junctions with traffic signals
30.60 Close of voting/ comment period
Intelligent transport systems — Roadside infrastructure supported locationbased services for connected automated mobility via nomadic and mobile devices — Part 4: Part 4: Unprotected turn at T-junctions
10.00 Proposal for new project registered
Intelligent transport systems — Roadside infrastructure supported location- based services on nomadic devices for connected automated mobility — Part 4: Unprotected turn at T-junctions
20.60 Close of comment period
Intelligent transport systems — Roadside infrastructure supported location- based services on nomadic devices for connected automated mobility — Part 5: Advisory right of way (ROW) at roundabouts
30.60 Close of voting/ comment period
Intelligent transport systems — Roadside infrastructure supported location- based services on nomadic devices for connected automated mobility — Part 6: Unprotected turn at junctions with traffic signals
30.60 Close of voting/ comment period
ITS — Roadside infrastructure supported location-based services on nomadic devices for connected automated mobility — Part 7: Part 7: Poor visibility advisory at boundaries
00.60 Close of review
Intelligent transport systems – Roadside infrastructure supported locationbased services on nomadic devices for connected automated mobility — Part 8: Incident prevention support in work zones
00.00 Proposal for new project received