DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS CLC/TS 50625-5:2017

Collection, logistics & Treatment requirements for WEEE - Part 5: Specification for the final treatment of WEEE fractions - Copper and precious metals

Mar 23, 2018

General information

60.60     Jan 25, 2018

DPS

DPS/KT 6

Technical Specification

13.030.99  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This Technical Specification addresses the processes regarding the recycling of copper and/or precious metals contained in WEEE and fractions of WEEE.
NOTE 1 For the treatment of WEEE EN 50625-1 applies.
This Technical Specification relates to the chemical and metallurgical processes used for the recycling of copper and/or precious metals contained in WEEE and fractions of WEEE, thereby differentiating it from manual/mechanical processing (see Annex A).
All chemical and metallurgical processes are included up and until the output materials will be used for their original purpose or for other purposes or will be finally disposed of.
NOTE 2 The main precious metals concerned are gold, silver, and palladium.
NOTE 3 The majority of the WEEE volumes that are processed by final treatment operators consists of fractions of WEEE (e.g. circuit boards) containing copper and/or precious metals, however there may be whole small WEEE that can be treated directly in final treatment (e.g. USB sticks).
NOTE 4 Chemical and metallurgical processes are processes in which a chemical reaction takes place for example: pyrolysis, smelting, refining, solvent extraction, ion exchange, leaching/dissolution in water acids or base, precipitation, cementation, pressure leaching. They differ from mechanical / physical processes such as sorting and separation based on physical properties (e.g. density, magnetism, colour) and size reduction processes such as shredding and grinding.
NOTE 5 In general, these final treatment facilities are covered by the IED 2010/75/EU, e.g. copper smelters or refiners.

Related directives

Directives related to this standards.

2012/19/EU

Directive 2012/19/EU of the European Parliament and of the Council of 4 July 2012 on waste electrical and electronic equipment (WEEE)

Life cycle

NOW

PUBLISHED
DS CLC/TS 50625-5:2017
60.60 Standard published
Jan 25, 2018

Related project

Adopted from CLC/TS 50625-5:2017

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login