Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements
40.20 DIS ballot initiated: 12 weeks
Gas Infrastructure - Compressor stations - Functional requirements
40.20 DIS ballot initiated: 12 weeks
GRP tanks and vessels for use above ground - Part 1: Raw materials - Specification conditions and acceptance criteria
40.60 Close of voting
LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment
40.20 DIS ballot initiated: 12 weeks
LPG Equipment and accessories - Pressure relief valves for LPG pressure vessels
40.20 DIS ballot initiated: 12 weeks
Design and manufacture of site built, vertical, cylindrical, flat-bottomed tank systems for the storage of refrigerated, liquefied gases with operating temperatures between 0 °C and -196 °C - Part 1: General
40.20 DIS ballot initiated: 12 weeks
Gas cylinders - Specifications and testing of LPG cylinder valves - Manually operated - Amendment 1 (ISO 15995:2021/Amd 1:2024)
40.20 DIS ballot initiated: 12 weeks
LPG equipment and accessories - Transportable refillable LPG cylinders other than traditional welded and brazed steel cylinders - Periodic inspection
40.20 DIS ballot initiated: 12 weeks
Outdoor hydrogen refuelling points dispensing gaseous hydrogen and incorporating filling protocols
40.20 DIS ballot initiated: 12 weeks
Natural gas fuelling stations - LNG unloading connector
40.20 DIS ballot initiated: 12 weeks
Natural gas fuelling stations - LNG unloading stop system
40.20 DIS ballot initiated: 12 weeks
Gas infrastructure - Injection stations - Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Gas infrastructure - Injection stations - Part 2: Specific requirements regarding the injection of biomethane
40.20 DIS ballot initiated: 12 weeks
Gas infrastructure - Injection stations - Part 3: Specific requirements regarding the injection of hydrogen
40.20 DIS ballot initiated: 12 weeks
Natural gas vehicles - Requirements for liquefied natural gas vehicle (LNGV) workshops and the management of liquefied natural gas (LNG) vehicles
40.20 DIS ballot initiated: 12 weeks
Natural gas vehicles - LNG vehicle fuelling procedures
40.20 DIS ballot initiated: 12 weeks
Loading and unloading of liquefied natural gas (LNG) tank wagons and containers (ISO 5124:2024)
40.20 DIS ballot initiated: 12 weeks