Gas infrastructure - Pipelines for maximum operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas Infrastructure - Compressor stations - Functional requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

GRP tanks and vessels for use above ground - Part 1: Raw materials - Specification conditions and acceptance criteria

40.60 Close of voting

DPS/KT 286 more

LPG equipment and accessories - Pressure relief valves for LPG pressure vessels - Ancillary equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

LPG Equipment and accessories - Pressure relief valves for LPG pressure vessels

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Design and manufacture of site built, vertical, cylindrical, flat-bottomed tank systems for the storage of refrigerated, liquefied gases with operating temperatures between 0 °C and -196 °C - Part 1: General

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas cylinders - Specifications and testing of LPG cylinder valves - Manually operated - Amendment 1 (ISO 15995:2021/Amd 1:2024)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

LPG equipment and accessories - Transportable refillable LPG cylinders other than traditional welded and brazed steel cylinders - Periodic inspection

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Outdoor hydrogen refuelling points dispensing gaseous hydrogen and incorporating filling protocols

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Natural gas fuelling stations - LNG unloading connector

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Natural gas fuelling stations - LNG unloading stop system

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas infrastructure - Injection stations - Part 1: General requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas infrastructure - Injection stations - Part 2: Specific requirements regarding the injection of biomethane

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas infrastructure - Injection stations - Part 3: Specific requirements regarding the injection of hydrogen

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Natural gas vehicles - Requirements for liquefied natural gas vehicle (LNGV) workshops and the management of liquefied natural gas (LNG) vehicles

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Natural gas vehicles - LNG vehicle fuelling procedures

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Decorative fuel-effect gas appliances

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Loading and unloading of liquefied natural gas (LNG) tank wagons and containers (ISO 5124:2024)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more