Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Railway applications - Braking - Functional and performance criteria of Magnetic Track Brake systems for use in railway rolling stock
10.99 New project approved
Railway applications - Ride comfort for passengers - Measurement and evaluation
40.20 DIS ballot initiated: 12 weeks
Railway applications - Wheelsets and bogies - Axles - Product requirements
40.20 DIS ballot initiated: 12 weeks
Railway applications - Aerodynamics - Part 4: Requirements and assessment procedures for aerodynamics on open track
40.20 DIS ballot initiated: 12 weeks
Railway applications - Infrastructure - Flash butt welding of new rails - Part 2: R200, R220, R260, R260Mn, R320Cr, R350HT, R350LHT, R370CrHT and R400HT grade rails by mobile welding machines at sites other than a fixed plant
40.20 DIS ballot initiated: 12 weeks
Railway applications - Straight and angled end cocks for brake pipe and main reservoir pipe
40.20 DIS ballot initiated: 12 weeks
Railway applications - Air conditioning for urban, suburban and regional rolling stock: Comfort parameters and type tests
40.20 DIS ballot initiated: 12 weeks
Railway applications - Crashworthiness requirements for rail vehicles
40.20 DIS ballot initiated: 12 weeks
Railway applications - In-service wheelset operation requirements - In-service and off-vehicle wheelset maintenance
40.20 DIS ballot initiated: 12 weeks
Railway applications - Braking - Brake pads
40.20 DIS ballot initiated: 12 weeks
Railway applications - Braking - Empty-loaded changeover devices
40.20 DIS ballot initiated: 12 weeks
Railway applications - Vehicle reference masses
40.20 DIS ballot initiated: 12 weeks
Railway applications - Track - Road-rail machines and associated equipment - Part 2: General safety requirements
40.20 DIS ballot initiated: 12 weeks
Railway applications - Testing and simulation for the acceptance of running characteristics of railway vehicles - Running safety under longitudinal compressive force
40.20 DIS ballot initiated: 12 weeks
Railway applications - Markings of railway vehicles - Part 1: Freight wagons
40.20 DIS ballot initiated: 12 weeks
Railway applications - Design requirements for steps, handrails and associated access for staff - Part 2: Freight wagons
40.20 DIS ballot initiated: 12 weeks
Railway applications - Driver's cab - Part 6: Integration of displays, controls and indicators for tram vehicles
40.20 DIS ballot initiated: 12 weeks
Railway applications - Driver's cab - Part 8: Tram vehicle layout and access
40.20 DIS ballot initiated: 12 weeks