DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Fixed firefighting systems - Components for sprinkler and water spray systems - Part 15: Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Steel wire ropes - Safety - Part 5: Stranded ropes for lifts

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Crane - Safety - Non-fixed load lifting attachments

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Foam systems - Part 1: Requirements and test methods for components

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Safety of machinery - Interlocking devices associated with guards - Principles for design and selection (ISO 14119:2024)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Water mist systems - Part 1: Design, installation, inspection and maintenance

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Water mist systems - Part 17: Test protocol for residential occupancies for automatic nozzle systems

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Gas extinguishing systems - Part 2: Physical properties and system design of gas extinguishing systems for FK-5-1-12 extinguishant (ISO 14520-5:2024, modified)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Tower cranes - Anti-collision systems - Safety requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Components for water mist systems - Part 3: Requirements and test methods for check valves

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Advanced fatigue testing methods — Part 1: Self-heating measurements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Advanced fatigue testing methods — Part 2: Stiffness method

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Robotic construction system for shotcrete digitization and automation through advanced perception, cognition, mobility and additive manufacturing skills

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Energy efficiency of industrial trucks - Test methods - Part 1: General (ISO 23308-1:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Energy efficiency of industrial trucks - Test methods - Part 2: Operator-controlled self-propelled trucks, burden and personnel carriers and towing tractors (ISO 23308-2:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Energy efficiency of industrial trucks - Test methods - Part 3: Container handling lift trucks (ISO 23308-3:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Energy efficiency of industrial trucks - Test methods - Part 6: Container straddle carrier (ISO 23308-6:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Safety rules for the construction and installation of lifts - Existing lifts - Part 82: Rules for the improvement of the accessibility of existing lifts for persons including persons with disability

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more