DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Robotics - Safety requirements - Part 1: Industrial robots (ISO 10218-1:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Robotics - Safety requirements - Part 2: Industrial robot applications and robot cells (ISO 10218-2:2025)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Safety of industrial trucks - Electrical/electronic requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Components for sprinkler and water spray systems - Part 15: Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Steel wire ropes - Safety - Part 5: Stranded ropes for lifts

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Machinery for supply and circulation of liquid coating materials - Safety requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Cranes - Loader cranes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Cranes - General design - Part 3-1: Limit states and proof competence of steel structure

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Cranes - General design - Part 3-5: Limit states and proof of competence of forged and cast hooks

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Crane - Safety - Non-fixed load lifting attachments

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Food processing machinery - Bowl lifting and tilting machines - Safety and hygiene requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Fixed firefighting systems - Foam systems - Part 1: Requirements and test methods for components

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Cranes - Offshore cranes - Part 1: General-purpose offshore cranes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Safety of machinery - Interlocking devices associated with guards - Principles for design and selection (ISO 14119:2024)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Cranes - Tower cranes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Rough-terrain trucks - Safety requirements and verification - Part 1: Variable-reach trucks

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Rough-terrain trucks - Safety requirements and verification - Part 4: Additional requirements for variable-reach trucks handling freely suspended loads

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Rough-terrain trucks - Safety requirements and verification - Part 5: Attachment interface

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more