DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Wind turbines - Electromagnetic compatibility

60.60 Standard published

DPS/KT 7 more

Wind turbines - Part 14: Declaration of apparent sound power level and tonality values

60.60 Standard published

DPS/KT 4 more

Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems

60.60 Standard published

DPS/KT 4 more

Wind turbines - Part 26-2: Production-based availability for wind turbines

60.60 Standard published

DPS/KT 4 more

Wind energy generation systems - Part 26-3: Availability for wind power stations

60.60 Standard published

DPS/KT 4 more

Renewable energy and hybrid systems for rural electrification – Part 7-2: Generator set – Off-grid wind turbines

60.60 Standard published

DPS/KT 6 more

Wind energy generation systems - Part 25-71: Communications for monitoring and control of wind power plants - Configuration description language

60.60 Standard published

DPS/KT 4 more

Recommendations for small renewable energy and hybrid systems for rural electrification - Part 7-3: Generator set - Selection of generator sets for rural electrification systems

60.60 Standard published

DPS/KT 6 more

Recommendations for small renewable energy and hybrid systems for rural electrification - Part 7: Generators

60.60 Standard published

DPS/KT 6 more

Recommendations for small renewable energy and hybrid systems for rural electrification - Part 8-1: Selection of batteries and battery management systems for stand-alone electrification systems - Specific case of automotive flooded lead-acid batteries available in developing countries

60.60 Standard published

DPS/KT 6 more

Recommendations for small renewable energy and hybrid systems for rural electrification - Part 9-6: Integrated system - Selection of Photovoltaic Individual Electrification Systems (PV-IES)

60.60 Standard published

DPS/KT 6 more

Energy performance of buildings - Method for calculation of system energy requirements and system efficiencies - Part 4-10: Wind power generation systems, Module M11-8-7

60.60 Standard published

DPS/KT 269 more

Guide for procurement of power station equipment - Part 5-3: Wind turbines

60.60 Standard published

DPS/KT 286 more

Wind turbines - Protective measures - Requirements for design, operation and maintenance

60.60 Standard published

DPS/KT 8 more

Wind turbines - Part 1: Design requirements

60.60 Standard published

DPS/KT 7 more

Wind turbines - Part 1: Design requirements

60.60 Standard published

DPS/KT 4 more

Wind turbines - Part 11: Acoustic noise measurement techniques

60.60 Standard published

DPS/KT 4 more

Wind turbines - Part 11: Acoustic noise measurement techniques

60.60 Standard published

DPS/KT 4 more