DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS CLC/TS 61400-26-2:2017

Wind turbines - Part 26-2: Production-based availability for wind turbines

Jun 25, 2018
95.99 Withdrawal of Standard   Mar 10, 2025

General information

95.99     Mar 10, 2025

DPS

DPS/KT 4

Technical Specification

27.180  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with:

- examples of determination of lost production,

- examples of algorithms for production-based indicators,

- examples of other performance indicators,

- examples of application scenarios.

Life cycle

NOW

WITHDRAWN
DS CLC/TS 61400-26-2:2017
95.99 Withdrawal of Standard
Mar 10, 2025

REVISED BY

PUBLISHED
SSH EN IEC 61400-26-1:2019

Related project

Adopted from CLC/TS 61400-26-2:2017