DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Nuclear power plants - Control rooms - Operator controls

20.99 WD approved for registration as CD

TC 45/SC 45A more

Amendment 1 - Compression and mechanical connectors for power cables - Part 1-1: Test methods and requirements for compression and mechanical connectors for power cables for rated voltages up to 1 kV (U<sub>m</sub> = 1,2 kV) tested on non-insulated conductors

20.99 WD approved for registration as CD

TC 20 more

Amendment 1 - Compression and mechanical connectors for power cables - Part 1-2: Test methods and requirements for insulation piercing connectors for power cables for rated voltages up to 1 kV (U<sub>m</sub> = 1,2 kV) tested on insulated conductors

20.99 WD approved for registration as CD

TC 20 more

Amendment 1 - Compression and mechanical connectors for power cables - Part 1-3: Test methods and requirements for compression and mechanical connectors for power cables for rated voltages above 1 kV (U<sub>m</sub> = 1,2 kV) up to 30 kV (U<sub>m</sub> = 36 kV) tested on non-insulated conductors

20.99 WD approved for registration as CD

TC 20 more

Determination of long-term radiation ageing in polymers - Part 1: Techniques for monitoring diffusion-limited oxidation

20.99 WD approved for registration as CD

TC 112 more

Materials for printed boards and other interconnecting structures - Part 2-52: Reinforced base materials clad and unclad - Thermosetting hydrocarbon resin system, woven E-glass reinforced laminate sheets of defined flammability (vertical burning test), copper-clad

50.99 FDIS or proof approved for publication

TC 91 more

Materials for printed boards and other interconnecting structures - Part 2-53: Reinforced base materials clad and unclad - PTFE unfilled laminate sheets of defined flammability (vertical burning test), copper-clad

50.99 FDIS or proof approved for publication

TC 91 more

Materials for printed boards and other interconnecting structures - Part 2-54: Reinforced base materials clad and unclad - Halogenated modified or unmodified resin system, woven E-glass laminate sheets of defined dissipation factor (less than 0,005 at 10 GHz) and flammability (vertical burning test), copper-clad for high speed applications

30.99 CD approved for registration as DIS

TC 91 more

Materials for printed boards and other interconnecting structures - Part 2-55: Reinforced base materials clad and unclad - Non-halogenated modified or unmodified resin system, woven E-glass laminate sheets of defined dissipation factor (less than 0,005 at 10 GHz) and flammability (vertical burning test), copper-clad for high speed applications

20.99 WD approved for registration as CD

TC 91 more

Materials for printed boards and other interconnecting structures - Part 3-6: Sectional specification set for unreinforced base materials, clad and unclad - PTFE filled laminate sheets of defined flammability (vertical burning test), copper-clad

40.60 Close of voting

TC 91 more

Nuclear reactors - Instrumentation and control systems important for safety - Detection of leakage in coolant systems

30.60 Close of voting/ comment period

TC 45/SC 45A more

Electrical insulating materials and systems - Part 2: DC voltage endurance evaluation

20.99 WD approved for registration as CD

TC 112 more

Electroacoustics - Personal sound exposure meters

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 29 more

Electric shavers for household use - Evaluation of experience and user satisfaction

40.20 DIS ballot initiated: 12 weeks

TC 59/SC 59L more

Medical diagnostic X-ray equipment - Radiation conditions for use in the determination of characteristics

50.00 Final text received or FDIS registered for formal approval

TC 62/SC 62C more

Amendment 1 - Fibre-optic communication subsystem test procedures - Part 4-2: Installed cabling plant - Single-mode attenuation and optical return loss measurements

30.20 CD study/ballot initiated

TC 86/SC 86C more

Overhead lines - Requirements and tests for fittings

30.99 CD approved for registration as DIS

TC 11 more

Industrial-process control - Safety of analyser houses

40.60 Close of voting

TC 65/SC 65B more