DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Electrical insulating materials and systems - Part 2: DC voltage endurance evaluation

20.99 WD approved for registration as CD

TC 112 more

Electroacoustics - Personal sound exposure meters

50.00 Final text received or FDIS registered for formal approval

TC 29 more

Electric shavers for household use - Evaluation of experience and user satisfaction

40.20 DIS ballot initiated: 12 weeks

TC 59/SC 59L more

Medical diagnostic X-ray equipment - Radiation conditions for use in the determination of characteristics

40.99 Full report circulated: DIS approved for registration as FDIS

TC 62/SC 62C more

Amendment 1 - Fibre-optic communication subsystem test procedures - Part 4-2: Installed cabling plant - Single-mode attenuation and optical return loss measurements

20.99 WD approved for registration as CD

TC 86/SC 86C more

Overhead lines - Requirements and tests for fittings

30.60 Close of voting/ comment period

TC 11 more

Industrial-process control - Safety of analyser houses

40.60 Close of voting

TC 65/SC 65B more

Optical amplifiers - Test methods - Part 1-2: Power and gain parameters - Electrical spectrum analyzer method

40.20 DIS ballot initiated: 12 weeks

TC 86/SC 86C more

Optical amplifiers - Test methods - Part 3-2: Noise figure parameters - Electrical spectrum analyzer method

30.20 CD study/ballot initiated

TC 86/SC 86C more

Amendment 1 - Optical amplifiers - Part 5-2: Qualification specifications - Reliability qualification for optical fibre amplifiers

40.20 DIS ballot initiated: 12 weeks

TC 86/SC 86C more

Insulating liquids - Determination of the partial discharge inception voltage (PDIV) - Test procedure

20.99 WD approved for registration as CD

TC 10 more

Process measurement and control devices - General methods and procedures for evaluating performance - Part 1: General considerations

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65/SC 65B more

Process measurement and control devices - General methods and procedures for evaluating performance - Part 2: Tests under reference conditions

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65/SC 65B more

Process measurement and control devices - General methods and procedures for evaluating performance - Part 3: Tests for the effects of influence quantities

40.99 Full report circulated: DIS approved for registration as FDIS

TC 65/SC 65B more

Process measurement and control devices - General methods and procedures for evaluating performance - Part 4: Evaluation report content

30.60 Close of voting/ comment period

TC 65/SC 65B more

Amendment 2 - Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 1: General and guidance

40.20 DIS ballot initiated: 12 weeks

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-19: Tests - Damp heat (steady state)

40.00 DIS registered

TC 86/SC 86B more

Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-2: Tests - Mating durability

40.20 DIS ballot initiated: 12 weeks

TC 86/SC 86B more