Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets
20.99 WD approved for registration as CD
Sustainable management of waste electrical and electronic equipment (e-waste) (Proposed Horizontal Publication)
50.60 Close of voting. Proof returned by secretariat
Black start of hydropower plant
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Energy efficiency - Customer energy management systems - Part 2-1: Data model and messaging - Interface between the distribution system operator/ energy management gateway and customer energy manager/ building energy manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
Energy efficiency - Customer energy management systems - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource manager(s) (Proposed horizontal publication)
50.00 Final text received or FDIS registered for formal approval
Energy Efficiency - Customer Energy Management Systems - Part 3: Energy Manager (Proposed horizontal publication)
20.99 WD approved for registration as CD
High-voltage test techniques - Dielectric loss measurements "PROPOSED HORIZONTAL STANDARD"
40.00 DIS registered
Draft proposal for a PAS on Intelligent Information Request and Delivery Specification<br /> (iiRDS) -A Process Model for Information Architecture
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Conductive charging of electric vehicles - Contact interface for automated connection device (ACD)
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 1: General requirements
40.20 DIS ballot initiated: 12 weeks
Photovoltaic power generating systems connection with grid - Testing of power conversion equipment - Part 2: Testing environment
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 4: Interface protection and fault ride through
20.99 WD approved for registration as CD
Photovoltaic power generating systems connection with the grid - Testing for power conversion equipment - Part 5: Electromagnetic compatibility for low frequency conducted disturbances
40.20 DIS ballot initiated: 12 weeks
Photovoltaic power generating systems connection with grid - Conformity assessment for power conversion equipment - Part 6: Power control functions and grid support
30.99 CD approved for registration as DIS
Photovoltaic power generating systems connection with the grid - Testing of power conversion equipment- Part 7: Remote configuration, control and monitoring
30.99 CD approved for registration as DIS
Ultrasonics - Shear-wave elastography - Part 2: Preparation and characterization of phantoms for performance and constancy testing
30.20 CD study/ballot initiated
Nuclear Power Plants - Instrumentation and control systems important to safety - Platform qualification
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Fixed accessories intended for household and similar purposes that supply power through an interface
40.00 DIS registered