Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Semiconductor devices - Semiconductor devices for IoT system - Part 2: Test method of semiconductor photon sources incorporating human factors for wearable equipment
30.20 CD study/ballot initiated
Carbon footprint calculation applicable to industrial lithium-ion batteries - Part 1: General requirements and methodology
50.60 Close of voting. Proof returned by secretariat
Materials used in photovoltaic (PV) cells - Part 1: Specifications for electrical characteristics of crystalline silicon wafers
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Quantification and communication of carbon footprint, GHG emission reductions and avoided emissions from electric and electronic products and systems - Principles, methodologies, requirements and guidance (Proposed horizontal publication)
50.60 Close of voting. Proof returned by secretariat
Thermal standardization on semiconductor packages - Part 2-2: 3D thermal simulation models of semiconductor packages for steady-state analysis - PBGA and FBGA packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 4: Thermal evaluation board specifications for fine pitch semiconductor packages
30.99 CD approved for registration as DIS
Thermal standardization on semiconductor packages - Part 6: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points
60.00 Standard under publication
Thermal standardization on semiconductor packages - Part 6-1: Thermal resistance and capacitance model for transient temperature prediction at junction and measurement points - Model creation method using a datasheet of semiconductor device
40.20 DIS ballot initiated: 12 weeks
Vehicle connector, vehicle inlet and cable assembly for Megawatt DC charging
60.00 Standard under publication
<p>Standard Interface for Connecting Charging stations to Local Energy Management Systems - Part-4 Test Specifications</p>
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 2: Data models Protocols, Messages
20.99 WD approved for registration as CD
Management of Distributed Energy Storage Systems based on Electrically Chargeable Vehicles (ECV-DESS) - Part 3: Conformance tests
20.99 WD approved for registration as CD
Power System Stability Control - Part 2: Guideline for quantitative assessment of power system stability and security
60.00 Standard under publication
Hybrid CPV/PV modules: General characteristics and measurement procedures - Part 1: Performance measurements and power rating - Irradiance and temperature
40.20 DIS ballot initiated: 12 weeks
Technical Specifications for Digitalization of Operation and Maintenance in Hydropower Assets
20.99 WD approved for registration as CD
Sustainable management of waste electrical and electronic equipment (e-waste)
50.00 Final text received or FDIS registered for formal approval
Black start of hydropower plant
50.00 Final text received or FDIS registered for formal approval
Nuclear facilities - Instrumentation, control and electrical power systems important to safety - Structure of the IEC SC 45A standards series
60.00 Standard under publication