DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Specification for wetting agents for application on Class A fires

20.20 Working draft (WD) study initiated

ISO/TC 21/SC 6 more

Titanium and titanium alloys-Plate, sheet and strip-Technical delivery conditions

20.20 Working draft (WD) study initiated

ISO/TC 79/SC 11 more

Titanium and titanium alloys — Bar, rod and billet-Technical delivery conditions

20.20 Working draft (WD) study initiated

ISO/TC 79/SC 11 more

Microbiology of the food chain — General requirements and guidance for microbiological examinations

20.20 Working draft (WD) study initiated

ISO/TC 34/SC 9 more

Fire detection and alarm systems — Part 29: Video fire detectors

20.20 Working draft (WD) study initiated

ISO/TC 21/SC 3 more

Fire detection and fire alarm systems — Part 32: Non-resettable line-type heat detectors

20.20 Working draft (WD) study initiated

ISO/TC 21/SC 3 more

Fire detection and alarm systems — Part 7: Point-type smoke detectors using scattered light, transmitted light or ionization

20.99 WD approved for registration as CD

ISO/TC 21/SC 3 more

Medical gas pipeline systems — Part 3: Proportioning units for the production of synthetic medical air

20.20 Working draft (WD) study initiated

ISO/TC 121/SC 6 more

Medical gas pipeline systems — Part 4: Air Compressor Units

20.20 Working draft (WD) study initiated

ISO/TC 121/SC 6 more

Medical gas pipeline systems — Part 5: Oxygen Concentrator UNits

20.20 Working draft (WD) study initiated

ISO/TC 121/SC 6 more

Metallic coatings for electromagnetic interference shielding — Designation and characterization method

20.20 Working draft (WD) study initiated

ISO/TC 107 more

Energy performance of building systems — Underfloor air distribution systems — Part 1: Definitions, terminology, technical specifications and symbols

20.20 Working draft (WD) study initiated

ISO/TC 163/SC 1 more

Adhesives-- Absorption of water into an adhesive layer using an open-faced specimen and determination of shear strength by secondary bonding

20.20 Working draft (WD) study initiated

ISO/TC 61/SC 11 more

Small-bore connectors for liquids and gases in healthcare applications — Part 1: General requirements

20.60 Close of comment period

ISO/TC 210 more

Lifts for the transport of persons and goods — Part 1: Safety rules for the construction and installation of passenger and goods passenger lifts

20.00 New project registered in TC/SC work programme

ISO/TC 178 more

Lifts for the transport of persons and goods — Part 2: Design rules, calculations, examinations and tests of lift components

20.00 New project registered in TC/SC work programme

ISO/TC 178 more

Traveller irrigation machines — Part 1: Operational characteristics and laboratory and field test methods

20.00 New project registered in TC/SC work programme

ISO/TC 23/SC 18 more

Iron ores for blast furnace feedstocks — Determination of the decrepitation index

20.20 Working draft (WD) study initiated

ISO/TC 102/SC 3 more