Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Specification for wetting agents for application on Class A fires
20.20 Working draft (WD) study initiated
Titanium and titanium alloys-Plate, sheet and strip-Technical delivery conditions
20.20 Working draft (WD) study initiated
Titanium and titanium alloys — Bar, rod and billet-Technical delivery conditions
20.20 Working draft (WD) study initiated
Microbiology of the food chain — General requirements and guidance for microbiological examinations
20.20 Working draft (WD) study initiated
Fire detection and alarm systems — Part 29: Video fire detectors
20.20 Working draft (WD) study initiated
Fire detection and fire alarm systems — Part 32: Non-resettable line-type heat detectors
20.20 Working draft (WD) study initiated
Fire detection and alarm systems — Part 7: Point-type smoke detectors using scattered light, transmitted light or ionization
20.99 WD approved for registration as CD
Medical gas pipeline systems — Part 3: Proportioning units for the production of synthetic medical air
20.20 Working draft (WD) study initiated
Medical gas pipeline systems — Part 4: Air Compressor Units
20.20 Working draft (WD) study initiated
Medical gas pipeline systems — Part 5: Oxygen Concentrator UNits
20.20 Working draft (WD) study initiated
Metallic coatings for electromagnetic interference shielding — Designation and characterization method
20.20 Working draft (WD) study initiated
Energy performance of building systems — Underfloor air distribution systems — Part 1: Definitions, terminology, technical specifications and symbols
20.20 Working draft (WD) study initiated
Adhesives-- Absorption of water into an adhesive layer using an open-faced specimen and determination of shear strength by secondary bonding
20.20 Working draft (WD) study initiated
Small-bore connectors for liquids and gases in healthcare applications — Part 1: General requirements
20.60 Close of comment period
Lifts for the transport of persons and goods — Part 1: Safety rules for the construction and installation of passenger and goods passenger lifts
20.00 New project registered in TC/SC work programme
Lifts for the transport of persons and goods — Part 2: Design rules, calculations, examinations and tests of lift components
20.00 New project registered in TC/SC work programme
Traveller irrigation machines — Part 1: Operational characteristics and laboratory and field test methods
20.00 New project registered in TC/SC work programme
Iron ores for blast furnace feedstocks — Determination of the decrepitation index
20.20 Working draft (WD) study initiated