DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

prDS IEC TR 62786-102:2025 ED1:2026

Distributed energy resources connection with the grid - Part 102: CAES connection to the grid

General information

10.00     16 jan 2026

DPS

DPS/KT 3

Technical Report

91.140.50     29.240.01  

Scope

IEC TR 62786-102:2025 provides principles and technical needs for the interconnection of the compressed air energy storage (CAES) system to the distribution network. It is suitable for the planning, design, operation and testing of CAES system interconnection to distribution networks. It includes the additional needs for the CAES system, such as connection scheme, grid-connected process and needs, response characteristics of active power to frequency, response characteristics of active power to current, response characteristics of active power to injecting mass flow, response characteristics of active power to pressure, selection of the point of connection (POC), electromagnetic compatibility (EMC) and power quality, communication and automation, monitoring and protection, immunity to disturbances, grid-connected testing needs, etc. This document will report response of active power to frequency, response of active power to current, response of active power to injecting mass flow, response of active power to pressure, response of reactive power to voltage, and grid-connected testing for distributed CAES system, as a supplement for IEC TS 62786-1:2023. This document reports the interface needs for connecting CAES system to distribution network operating at a nominal frequency of 50 Hz or 60 Hz.

Life cycle

NOW

IN_DEVELOPMENT
prDS IEC TR 62786-102:2025 ED1:2026
10.00 Proposal for new project registered
16 jan 2026

Related project

Adopted from IEC TR 62786-102:2025 ED1 IDENTICAL