DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN IEC 61280-4-5:2020/AC:2022-02

Procedurat e testimit të nënsistemit të komunikimit me fibra optike - Pjesa 4-5: Impiant kabllor i instaluar - Matja e dobësimit të impiantit të kabllor me fibra optike të terminuar me MPO duke përdorur pajisje testimi me ndërfaqe MPO

Fibre-optic communication subsystem test procedures - Part 4-5: Installed cabling plant - Attenuation measurement of MPO terminated fibre optic cabling plant using test equipment with MPO interfaces
26 dhj 2025

General information

60.60     26 dhj 2025

DPS

DPS/KT 3

European Norm

33.180.01  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

Life cycle

NOW

PUBLISHED
SSH EN IEC 61280-4-5:2020/AC:2022-02
60.60 Standard published
26 dhj 2025

Related project

Adopted from EN IEC 61280-4-5:2020/AC:2022-02 IDENTICAL

Adopted from IEC 61280-4-5:2020/COR1:2022 ED1 IDENTICAL