DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH ISO 21725-2:2021

Projektimi i thjeshtuar i urave të betonit të paranderur - Pjesa 2: Urat me trarë me kuti

Simplified design of prestressed concrete bridges — Part 2: Box-girder bridges
31 tet 2023

General information

60.60     31 tet 2023

95.99   

DPS

DPS/KT 104

International Standard

93.040     91.080.40  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).
Designs and details for new road bridges address structural integrity by considering the following:
—    the use of continuity and redundancy to provide one or more alternate paths;
—    structural members and bearing seat widths that are resistant to damage or instability; and
—    external protection systems to minimize the effects of reasonably conceived severe loads.

Life cycle

NOW

PUBLISHED
SSH ISO 21725-2:2021
60.60 Standard published
31 tet 2023

Related project

Adopted from ISO 21725-2:2021