DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

DS IEC TS 63217:2021 ED1

Inverter fotovoltaikë (PV) të ndërlidhur me linjat e furnizimit - Procedura e provës për matjet e kalimit të mbitensionit

Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements
16 sht 2022

General information

60.60     16 sht 2022

95.99   

DPS

DPS/KT 6

Technical Specification

27.160  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC TS 63217:2021 provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems.
This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems. This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.

Life cycle

NOW

PUBLISHED
DS IEC TS 63217:2021 ED1
60.60 Standard published
16 sht 2022

Related project

Adopted from IEC TS 63217:2021 ED1

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login