DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH ISO 21927-5:2018

Sisteme të kontrollit të tymit dhe nxehtësisë - Pjesa 5: Sisteme mekanike të nxjerrjes së tymit - Kërkesat dhe planifikimi

Smoke and heat control systems - Part 5: Powered smoke exhaust systems - Requirements and design
2 pri 2020

General information

60.60     13 shk 2020

DPS

DPS/KT 114

Pure national standard

13.220.20  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

This document applies to powered smoke exhaust systems in spaces with a large area and with a ceiling height of minimum 3 m, in which smoke protection is required. It includes tables and calculation methods for the design of clear layers in order to comply, inter alia, with the requirements of various protection objectives.

This document includes information and provisions concerning the requirements for powered smoke exhaust systems, their design and rules for their installation.

NOTE: The requirements for testing the ventilators are dealt with in ISO 21927-3. Other parts of the ISO 21927 series of standards deal with the power supply (ISO 21927-10), control equipment (ISO 21927-9) and smoke control ducts and smoke control dampers (ISO 21927-7 and ISO 21927-8 respectively).

Life cycle

NOW

PUBLISHED
SSH ISO 21927-5:2018
60.60 Standard published
13 shk 2020