DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 125500:1996

Sistemi i harmonizuar i vlerësimit të cilësisë për komponentët elektronikë - Specifikim i ndërmjetëm: Bërthamat unazore prej oksidi magnetik për aplikime shuarjeje interference dhe transformator me nivel të ulët sinjali

Sectional Specification: Magnetic oxide ring cores for interference suppression and low level signal transformer applications
28 mar 2006

General information

60.60     1 jan 2007

DPS

DPS/KT 4

European Norm

29.100.10  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

This Sectional Specification prescribes the characteristics, ratings and inspection requirements of assessed quality for ring cores made of soft magnetic oxides and iron powders. Such cores are intended for chokes for interference suppression and also for low level signam transformers for professional and industrial applications (see note below). In order to increase winding ease and to improve voltage breakdown, the cores are often provded with protective coatings.

In annex A methods for testing voltage breakdown are given; in annex B a standard series of ring cores is listed.

NOTE: Ring cores used for power application are covered by CECC 25 300. Ring cores used for other applications (e.g. pulse, memory storage) are not considered here.

It selects from the Generic Specification CECC 25 000, the appropriate methods of test to be used in Detail Specifications derived from this specification, and contans the test schedules to be used in the preparation of such specifications. Each test schedule, referenced by a CECC number, when taken with the appropriate information in clause 5 of this specification, forms a Blank Detail Specification.

Life cycle

NOW

PUBLISHED
SSH EN 125500:1996
60.60 Standard published
1 jan 2007

Related project

Adopted from EN 125500:1996

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login