SSH EN ISO 11295:2017

Klasifikimi dhe informacioni mbi projektimin dhe aplikimin e sistemeve të tubacioneve plastike të cilat përdoren për rinovim dhe zëvëndësimi (ISO 11295:2017)

Classification and information on design and applications of plastics piping systems used for renovation and replacement (ISO 11295:2017)
14 maj 2018
95.99 Withdrawal of Standard   29 dhj 2025

General information

95.99     29 dhj 2025

DPS

DPS/KT 249

European Norm

23.040.01  

anglisht  

Buying

Shfuqizuar

Language in which you want to receive the document.

Scope

ISO 11295:2017 defines and describes families of techniques for the renovation and trenchless replacement (on or off the line of an existing pipeline) of non-pressure and pressure pipelines through the use of plastics pipes, including plastics composites formed in situ into pipes, fittings and ancillary components. It does not include new construction provided as network extension. For each technique family, it identifies areas of application including, but not limited to, underground drainage and sewerage, and underground water and gas supply networks.
ISO 11295:2017 provides information on the principles of, but not the detailed methodologies for, the design of plastics piping systems used for renovation or trenchless replacement of existing pipelines, covering:
- existing pipeline and site conditions;
- functions of the new pipeline;
- structural performance;
- hydraulic performance;
- installation aspects and site impact;
- other factors affecting renovation or trenchless replacement technique selection.
Necessary work on the existing pipeline prior to renovation and/or trenchless replacement is outside the scope of ISO 11295:2017.
ISO 11295:2017 provides information needed to determine viable options and for identification of the optimal technique with regard to a given set of rehabilitation objectives.
NOTE It is the responsibility of the designer to choose and design the renovation or trenchless replacement system.
It does not specify the calculation methods to determine, for each viable technique, the required amount of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN ISO 11295:2010

NOW

WITHDRAWN
SSH EN ISO 11295:2017
95.99 Withdrawal of Standard
29 dhj 2025

REVISED BY

PUBLISHED
SSH EN ISO 11295:2022

Related project

Adopted from EN ISO 11295:2017

Adopted from ISO 11295:2017 IDENTICAL