DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 62065:2014

Pajisjet dhe sistemet e lundrimit detar dhe radiondërlidhjes - Sistemet e kontrollit të kursit - Kërkesat operacionale dhe të performancës, metodat e provës dhe rezultatet e kërkuara të provës

Maritime navigation and radiocommunication equipment and systems - Track control systems - Operational and performance requirements, methods of testing and required test results
3 qer 2015

General information

60.60     12 jan 2015

DPS

DPS/KT 9

European Norm

47.020.70  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 62065:2014(E) specifies the minimum operational and performance requirements, methods of testing and required test results conforming to performance standards adopted by the IMO in resolution MSC.74(69) Annex 2 Recommendation on Performance Standards for Track Control Systems. In addition, it takes into account IMO resolution A.694(17) to which IEC 60945 is associated. When a requirement of this standard is different from IEC 60945, the requirement in this standard takes precedence. Also it takes into account IMO resolution MSC.302(87) on bridge alert management (BAM). This second edition cancels and replaces the first edition published in 2002 and constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - alarms and warnings have been brought into line with the requirements for Bridge Alert Management; - requirements for the category B system have been revised; - the parameters of the ship models of Annex I have been adjusted to resemble more Newtonian-like behaviour and the tidal current has been modelled; - a new Annex K has been added with interface requirements.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 62065:2002

NOW

PUBLISHED
SSH EN 62065:2014
60.60 Standard published
12 jan 2015

REVISED BY

IN_DEVELOPMENT
prSSH EN IEC 62065:2025

Related project

Adopted from EN 62065:2014

Adopted from IEC 62065 Ed. 2.0 en