SSH EN 62439-1:2010

Rrjeta industriale komunikimi - Rrjeta automatizimi me disponueshmëri të lartë - Pjesa 1: Koncpete të përgjithshme dhe metoda përllogaritjeje

Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
13 dhj 2011

General information

60.60     13 dhj 2011

DPS

DPS/KT 9

European Norm

25.040     35.040  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

IEC 62439-1:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies: - the common elements and definitions for other parts of the IEC 62439 series; - the conformance test specification (normative); - a classification scheme for network characteristics (informative); - a methodology for estimating network availability (informative); - the configuration rules, calculation and measurement method for a deterministic recovery time in RSTP. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008): - adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), - adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol), - moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents, - moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes, - moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes, - moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and - moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes, - adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8, - adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and - introducing the DRP protocol as IEC 62439-6.

Life cycle

PREVIOUSLY

Replaces
SSH EN 62439:2008

NOW

PUBLISHED
SSH EN 62439-1:2010
60.60 Standard published
13 dhj 2011

Related project

Adopted from EN 62439-1:2010

Adopted from IEC 62439-1 Ed. 1.0 en

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.