1.1 This standard establishes general principles for the construction of piles - which are formed in the ground by boring by excavation; and - which contain a structural member to transfer loads and/or limit deformations.1.2 The cross section of bored piles covered by this standard can be of - circular shape (see figure 1), - barrette shape if the section is concreted ina single operation. 1.3 A barrette may be square, rectangular, T- or L-shaped inplan or have any other similar configuration (see figure 2).
WITHDRAWN
SSH EN 1536:2006
95.99
Withdrawal of Standard
29 pri 2015
WITHDRAWN
SSH EN 1536:2010
Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.