DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 60904-7:2009

Pajisjet fotovoltaike - Pjesa 7: Llogaritja e gabimit të mospërputhjes spektrore për matjet e pajisjes fotovoltaike

Photovoltaic devices - Part 7: Computation of the spectral mismatch correction for measurements of photovoltaic devices
24 nën 2009
95.99 Withdrawal of Standard   23 pri 2025

General information

95.99     23 pri 2025

DPS

DPS/KT 6

European Norm

27.160  

anglisht  

Buying

Shfuqizuar

Language in which you want to receive the document.

Scope

IEC 60904-7:2008 describes the procedure for correcting the bias error introduced in the testing of a photovoltaic device, caused by the mismatch between the test spectrum and the reference spectrum and by the mismatch between the spectral responses (SR) of the reference cell and of the test specimen. The procedure applies only to photovoltaic devices linear in SR as defined in IEC 60904-10. This procedure is valid for single junction devices but the principle may be extended to cover multijunction devices. This new edition includes the following changes with respect to the previous one: description of when it is necessary to use the method and when it may not be needed; addition of new clauses.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH EN 60904-7:1998

NOW

WITHDRAWN
SSH EN 60904-7:2009
95.99 Withdrawal of Standard
23 pri 2025

REVISED BY

PUBLISHED
SSH EN IEC 60904-7:2019

Related project

Adopted from EN 60904-7:2009

Adopted from IEC 60904-7 Ed. 3.0 b