DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

SSH EN 13232-5:2007

Zbatime në hekurrudhë - Trase - Kontaktet dhe kryqëzimet - Pjesa 5: Kontaktet

Railway applications - Track - Switches and crossings - Part 5: Switches
95.99 Withdrawal of Standard   17 maj 2012

General information

95.99     17 maj 2012

DPS

DPS/KT 256

European Norm

45.080  

Scope

The scope of this European Standard is:
establish a working definition for switches and their constituent parts and identify the main types;
specify the minimum requirements for the manufacture of the switches and/or constituent parts;
specify codes of practice for inspection and tolerances of both full and half sets of switches and their constituent parts;
establish the limits and scope of supply;
list the methods by which switches and their parts should be identified and traced;
list the different and varying ways by which switches can be described using the following parameters:
geometry of the switches;
types of construction;
performance requirements;
design criteria;
tolerances and inspection.

Related directives

Directives related to this standards.

96/48/EC

Ndërveprimi i sistemeve hekurudhore ndër-Evropiane të shpejtësisë së lartë

93/38/EEC

Procedura prokurimi të entiteteve që veprojnë në sektorët e ujit, energjisë, transportit dhe telekomunikacionit

Life cycle

NOW

WITHDRAWN
SSH EN 13232-5:2007
95.99 Withdrawal of Standard
17 maj 2012

REVISED BY

PUBLISHED
SSH EN 13232-5:2005+A1:2011

Related project

Adopted from EN 13232-5:2005

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login