Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Photovoltaics in buildings - Part 3: Determination methodology for the solar heat gain coefficient of building-integrated photovoltaic modules
50.60 Close of voting. Proof returned by secretariat
Photovoltaics in buildings — Part 3: Evaluation methodology of SHGC for Building integrated photovoltaic modules with various designs
50.60 Close of voting. Proof returned by secretariat
Grid code compliance assessment methods for grid connection of renewable energy power plants
50.00 Final text received or FDIS registered for formal approval
Electrical installations in ships – Primary and secondary DC distribution, system design architecture
30.60 Close of voting/ comment period
Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality
20.99 WD approved for registration as CD
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 1: Performance
40.60 Close of voting
Secondary cells and batteries containing alkaline or other non-acid electrolytes - Sealed nickel-metal hydride cells and batteries for use in industrial applications - Part 2: Safety
40.60 Close of voting
Information exchange for electric vehicle charging roaming service Part 3: Message structure
30.60 Close of voting/ comment period
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 1: General principles
40.00 DIS registered
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 2: Diagram symbols and drawing principles
20.99 WD approved for registration as CD
Application function blocks and logic diagrams in oil & gas, process and power industries - System Control Diagram - Part 3: Application Function Blocks
30.20 CD study/ballot initiated
Guidance for installation procedures and tolerances of hydroelectric machines – Part 7: Horizontal generators
40.20 DIS ballot initiated: 12 weeks
Guidance for installation procedures and tolerances of hydroelectric machines – Part 8: Horizontal Francis turbines
40.20 DIS ballot initiated: 12 weeks
Commercial Electric dishwashing machines - Test methods for measuring the performance
40.00 DIS registered
Eyewear display - Part 20-10: Fundamental measurement methods - Optical properties
40.60 Close of voting
Eyewear display - Part 201-10: Optical characteristics of VR type – Singlet lens used for eyepieces
20.99 WD approved for registration as CD
Eyewear display – Part 23-1: Contact lens type – Generic introduction
20.99 WD approved for registration as CD