DPS
Drejtoria e Përgjithshme e Standardizimit
Tel/Cel: +355 4 222 62 55
E-mail: info@dps.gov.al
Adresa: Rr.: "Reshit Collaku", (pranë ILDKPKI, kati VI), Kutia Postare 98, Tiranë - Shqipëri
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Cooperative Multiple Systems in Connected Home Environments – AAL SOTIF of E/E Systems

20.99 WD approved for registration as CD

SyC AAL më tepër

Nuclear Power Plants - Instrumentation and control systems important to safety - Cable assemblies for harsh environment purposes

40.60 Close of voting

TC 45/SC 45A më tepër

Guideline for the adjustment potential evaluation of demand side resources

30.60 Close of voting/ comment period

TC 8/SC 8B më tepër

Optical fibre cables – Microduct technology – Guidance

50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks

TC 86/SC 86A më tepër

RTV silicone rubber coated insulators for AC and DC high-voltage applications - definitions, test methods and acceptance criteria

30.20 CD study/ballot initiated

TC 36 më tepër

Communication Standards Mapping

30.60 Close of voting/ comment period

TC 65/SC 65C më tepër

Nuclear facilities - Human machine interfaces - Operator support systems

50.60 Close of voting. Proof returned by secretariat

TC 45/SC 45A më tepër

Insulation monitoring device - Marine application example

50.00 Final text received or FDIS registered for formal approval

TC 18 më tepër

Off grid and unreliable grid refrigerating appliances for domestic and light commercial use - Characteristics and test methods - Performance requirements and energy consumption

40.60 Close of voting

TC 59/SC 59M më tepër

Railway applications - Fixed installations - Protection principles for AC and DC electric traction power supply systems

60.00 Standard under publication

TC 9 më tepër

Robotics for electricity generation, transmission and distribution systems - Part 2-1: General Technical Requirements for UAS for Overhead Power Lines Inspection

30.60 Close of voting/ comment period

TC 129 më tepër

Ultrasonics - Measurement of temperature rise produced by medical ultrasonic equipment

30.99 CD approved for registration as DIS

TC 87 më tepër

Guidelines for the assessment of rodent resistance for optical fibre cables

50.60 Close of voting. Proof returned by secretariat

TC 86/SC 86A më tepër

Distributed Energy Resource Aggregation Business . Part 1: System architecture and service scenario

50.00 Final text received or FDIS registered for formal approval

SyC Smart Energy më tepër

Distributed Energy Resource Aggregation Business System - Part 2: Risk assessment and treatment

20.99 WD approved for registration as CD

SyC Smart Energy më tepër

Industrial networks – Ethernet-APL port profile / Ethernet-SPE profile specification

30.60 Close of voting/ comment period

TC 65/SC 65C më tepër

System referencing conductor switching device

60.00 Standard under publication

TC 23/SC 23K më tepër

Low and ultra-low latency communication and control systems

50.99 FDIS or proof approved for publication

TC 100 më tepër